Construction of Kuruman N14/R31 bypass road Phase 1A in Kuruman, Northern Cape. Value of R41 454 413.06. Scope of works could include overhaul, clearing and grubbing, excavation for open drains, prefabricated culverts, concrete kerbing, concrete, channelling, chutes and downpipes, and concrete linings
Periodic maintenance on National Route 12 Section 5 from Three Sisters at km 0.0 to Victoria West at km 60.80, Pixley ka Seme District and Local Municipality, Northern Cape. CIDB 8CE. The exact GPS location is not known and the marker has been placed on N12 along the construction route 31°52'50.5"S 23°04'56.3"E
Construction of the Segonyana Mall located on the corner of Tsening Road and Bree Street, Kuruman, Northern Cape. The development will be built on a 3.1 hectares site, optimally located opposite side of the prominent taxi rank. The centre will have a total of 34 stores, 344 parking bays and measure approximately
Construction of a new building for the Jan Kempdorp Magistrates Office, located on Erf 253, on the corner of Piet Retief and Arbeid Street, Jan Kempdorp, Northern Cape. Value of R103 062 906,96. The exact GPS co-ordinates are 27°54'58.7"S 24°50'14.5"E.
Construction of 1200ND bulk water welded steel pipeline from Riverton to Midstation in Kimberley, Northern Cape. CIDB 9CE. The GPS coordinates are not known and have been placed at the Riverton WWTW 28°31'14.3"S 24°42'06.8"E
Periodic maintenance of National Route 10 Section 7 from De Aar at km 0.00 to Britstown at km 48.30 in the Pixely ka Seme District Municipality, Northern Cape. The GPS marker has been placed along the route of construction, 30°39'05.9"S 23°58'28.6"E .
Special maintenance of National Route R382 Section 2 from Port Nolloth at km 0.00 to Steinkopf at km 91.374 in the local municipalities of Kgatelopele and Dikgatlong, Northern Cape. The approximate GPS location has been placed along the proposed area of construction, 29°15'18.2"S 16°52'08.4"E.
Special maintenance on National Route R31 Section 6 from Danielskuil at km 0.0 to Delportshoop at km 78.71 in the Local Municipalities of Kgatelopele and Dikgatlong, Northern Cape. The approximate GPS location has been placed along the proposed area of construction, 28°10'35.0"S 23°33'11.1"E.
Periodic maintenance and resurfacing on National Route R31 Section 7 from Delportshoop at km 0.00 to Barkly West at km 30.61 in Dikgatlong Local Municipality, Northern Cape. The exact GPS location is not known and the marker has been placed on the R31 between the proposed areas of construction, 28°27'09.4"S
Construction of a 115MW photovoltaic solar facility and associated infrastructure on portion 2 (Karabee A) of the farm Karabee No. 50, Registration Division, Prieska in the Northern Cape. The town of Prieska is located approximately 15km north west of the proposed development which will be known as Camelthorn