Construction of the 900MW Kareekloof Solar PV Facility and BESS, located on Portion 1 of the farm Bas Berg 88, Portion 2 of the farm Koppy Alleen 83 and Portions 6, 11, 16 & 17 of the farm Karee Kloof 85, situated near De Aar, Northern Cape. The total development area is 1513 ha, consisting of: PV 1442
Periodic maintenance on National Route 12 Section 5 from Three Sisters at km 0.0 to Victoria West at km 60.80, Pixley ka Seme District and Local Municipality, Northern Cape. CIDB 8CE. The exact GPS location is not known and the marker has been placed on N12 along the construction route 31°52'50.5"S 23°04'56.3"E
Upgrade of internal water reticulation network for Phase 2 in Chris Hani, Richblock and Las Vegas located within the Magareng Local Municipality, Northern Cape. The project value is R 24 449 047,15. The exact GPS co-ordinates are not known so the marker has been placed at the Magareng Local Municipality
Construction of 1200ND bulk water welded steel pipeline from Midstation to Newton in Kimberley, Northern Cape. CIDB 9CE. The GPS coordinates have been placed at the estimated location of Midstation 28°38'10.6"S 24°43'34.7"E
Periodic maintenance on National Route 10 Section 8 from Britstown at km 0.00 to Schilders Pan at km 61.64 in the Pixely ka Seme District Municipality, Northern Cape. CIDB 8CE. The GPS marker has been placed along the proposed construction route 30°27'07.8"S 23°22'38.8"E.
Periodic maintenance and resurfacing of National Route 12 on Section 9 from Hope Town at km 0.00 to Kimberley at km 117.50 within the Pixley ka Seme and Frances Baard District Municipalities and Siyancuma, Sol Plaatjie and Thembalihle Local Municipalities, Northern Cape. CIDB 9CE. The GPS Marker has
Construction of the Kuruman taxi and bus rank on Erf 2830, Tsenin in Kuruman, Northern Cape. CIDB 8GB. The project comprises of the breaking down of the existing bus and taxi rank and construct the new rank with two levels and offices. The GPS coordinates are 27°27'22.5"S 23°25'59.8"E
Construction and upgrading of Lareng Primary School on 63 Hoof Street in Kuruman, Northern Cape. CIDB 7GB. Scope of works could include: Ten classrooms, double ECD, medium admin block, repair and renovations. The GPS location is 27°27'48.0"S 23°25'59.4"E.
Construction of Kuruman N14/R31 bypass road Phase 1A in Kuruman, Northern Cape. Value of R41 454 413.06. Scope of works could include overhaul, clearing and grubbing, excavation for open drains, prefabricated culverts, concrete kerbing, concrete, channelling, chutes and downpipes, and concrete linings
Construction of the Segonyana Mall located on the corner of Tsening Road and Bree Street, Kuruman, Northern Cape. The development will be built on a 3.1 hectares site, optimally located opposite side of the prominent taxi rank. The centre will have a total of 34 stores, 344 parking bays and measure approximately