Construction of the Twenty1 mixed-use development located on ERF 202/2 on Jellicoe Avenue, Rosebank, Gauteng. The scope of works involve the construction of a 10 storey development that comprises of 87 apartments, a commercial ground floor and dual above ground parking decks. The GPS coordinates are
Construction of the Epione Health Villages located at 5 Glenhove Road with access from Tottenham Avenue, Erf 38, Melrose Estate, Rosebank, Johannesburg, Gauteng. The scope of works of the surgical center includes a day clinic with consulting rooms, covering a gross leasable area (GLA) of 4529m². The
Construction of The Hive Oxford residential development at 41 Ashford Road, Parkwood, Rosebank, Gauteng. The development comprises of 292 units in nine storeys with four
basement parking levels, one level of retail and parking with related external works. The GPS coordinates are -26.1497376, 28.04428
The upgrading of surfacing on National Route N17 Section 2, from N3 at km 3.0 to Tonk Meter at km 33.45, in the Ekuhurleni Metropolitan Municipality, Gauteng. The contract value is R607 450 619.79. The exact GPS co-ordinates are not known and the marker has been placed along the possible construction
Manufacturing of NCP vehicles in Isondo, Sasolburg, Gauteng. The exact details of the project location, scope and value is still to be confirmed. The GPS Coordinates have been placed in Isondo Lat -26.7895628 & Long 27.8495522
Construction of 8 x 2 level blocks of about 40 units each to accommodate approximately 364 students on 9 100m² located at Land is Wealth farm lodge, Sterkfontein, Gauteng. CIDB 8GB . The exact GPS Coordinates are 26°00'44.7"S 27°41'34.2"E.
Construction of the K148 Road, between K146 and K133, including the N3/K148 Interchange and bridge (approximately 6km), in Gauteng. R455 418 557.00. The exact co-ordinates are currently not available however the approximate area of location is 26°23'56.6"S 28°13'50.7"E
Upgrading of the existing Cleveland 88kV / 11kV Substation and associated equipment in Johannesburg, Gauteng. CIDB 8 R40 - R130 million.The exact co-ordinates are currently not available however the approximate area of location is Latitude -26.206845 Longitude 28.1137309
Sibanye completed a pre-feasibility study investigating the potential of solar power as an alternative source of electrical power to partially insulate the company from the effects of electricity supply interruptions from Eskom. The PFS confirmed that solar power provided an economically competitive