You are currently logged out and we are unable to show you directory results. Please Log in or Subscribe for ALL the information relating to your search.

Found 693 items with Total of 697 results

Advertising



Projects

Acornhoek Sports Facility Phase 2
203
  • 28582
Construction of phase 2 of the Acornhoek sports facility, Acornhoek, Mpumalanga. CIDB Grading 7 CE. The exact GPS location is not known and the marker has been placed at- Bushbuckridge Local Municipality Head Office 24°50'23.2"S 31°04'00.5"E.


Projects

Msauli South Asbestos Mine
145
  • 32195
Rehabilitation of the Msauli South asbestos mine in Mpumalanga. R43 180 602,72. Estimated GPS Coordinates -26.004085553826396, 31.075704815043085


Projects

Thuso Opencast Coal Mine, Mpumalanga
237
  • 19433
The Thuso (previously Witfontein) project is located on the farm Holfontein 111 IS (remaining extent) and farm Witrand 103IS portions, 11, 12, 15, 19 and 20 approximately 13km north west of the town of Bethal in the Mpumalanga Province.The proposed Witfontein project has a measured coal resource of 18.86


Projects

N2 Section 34: Leiden to Camden
420
  • 11394
Improvement of National route N2 section 34 between Leiden from km 59 to Camden at km 87.4 in Mpumalanga and in the district municipality of Gert Sibande. Value of R3 173 163 941,43. Exact co-ordinates are not known and the marker has been placed in the vicinity of Camden 26°36'13.9"S 30°06'56.6"E


Projects

N2 Section 34 - P97/2 and road D803
311
  • 17489
Upgrading of the national route N2 Section 34, Panbult Intersection: Link and grade-separation scheme for road P97/2 and road D803 for the Kangra Mine coal haulage at Panbult, Mpumalanga. Estimated value of R630 559 000.00 Scope of works include: Construction of a 3-span continuous bridge with a post


Projects

Reseal of National Route R38 Section 2
92
  • 31763
The reseal of National Route R38 Section 2 from Bethal at km 5.0 to Hendrina at km 43.56, located in the Local Municipality of Steve Tshwete and District Municipality of Govan Mbeki in Mpumalanga. the exact GPS co-ordinates are not known so the marker has been placed at the start of the route in Bethal


Projects

Empuluzi Water Scheme AC pipes
97
  • 32278
Replacing of water AC pipes in Empuluzi water Scheme in Empuluzi, Mpumalanga. Estimated value of R45 512 005,55. The exact GPS coordinates are not known and the marker has been placed at the Chief Albert Luthuli Municipality 26°17'37.9"S 30°46'22.6"E


Projects

Elikhulu Tailings Project, Phase 3
214
  • 19804
Phase 3 is the re-establishment of the hydromining infrastructure to the Winkelhaak Tailings dump at the Evander Gold Mine in Mpumalanga. A definitive feasibility study completed on the Elikhulu tailings project has shown the project to have excellent recovered grades and gold production, attractive


Projects

N17 Section 5
105
  • 34985
Improvement of National Route N17 Section 5 from km 74,65 to km 110,0 in the Local Municipality Chief Albert Luthuli, District Municipality of Gert Sibande, Mpumalanga. The exact GPS location is not known and the marker has been placed along the estimated construction route 26°12'00.8"S 30°57'09.7"E


Projects

R35 Section 2 Bethal to Middelburg
91
  • 31946
Resurfacing of the R35 Section 2 from Bethal at km 0.00 to Middelburg at km 74.6 in the Steve Tshwete District Municipality, Mpumalanga Province. The GPS Marker has been placed at the start of the R35 in Bethal 26°27'37.6"S 29°28'11.7"E

Advertising

Send me a Sample Based on these search results