Construction of a residential development of 16 blocks consisting of a total of 68 apartments situated off Lever Road, along 13th Road, Midrand, Johannesburg, Gauteng. R45 Million. GPS -25.9727096, 28.1242396
Construction of the new heliport Phase 2 located on Juskei View Ext 158 Ptn 1 of the Farm Waterval 5-IR, Waterfall logistics Precinct, Ultimate Heliport, 1 Ultimate Road, off Bridal Veil Road, Midrand, Gauteng. The scope of work involves construction of a new hanger, offices and associated external works.
Construction of Road K60 between Maxwell Drive and Allandale Road, Midrand, Gauteng. CIDB 9CE. The scope of work includes the construction of a four-lane, undivided single carriageway section of Road K60. Some parts of K60 along this route have already been built as a two-lane single carriageway, and
Upgrades and renovation works to the Halfway House Water located in the industrial suburb of Halfway House, Midrand, Gauteng. CIDB 9GB. This Contract comprises inter alia of the construction of new bulk water pipelines to commission the new 25ML Halfway House reservoir. The feeder portion of the bulk
Construction of a new classroom block for the Curro Sagewood campus located on on Portion 637 of the farm Randjiesfontein 405, Sagewood Street, Liebenberg Road, Noordwyk, Midrand, Gauteng. The scope of work involved is to construct the new classroom Block N and alterations and additions to the existing
Construction of the Midrand Heights Residential located on Erf 3, corner Old Pretoria Road and Alexandra Avenue, Grand Central Extension 9, Midrand, Gauteng. A 12-storey affordable housing development comprising two basement levels and ten residential floors. The project includes a total of 306 residential
Construction of the Midrand Day Hospital located on Portion 98 of the Farm Witpoort 406 JR, within the City of Johannesburg, Gauteng. The proposed scope of works involves the construction of a 25 bed capacity hospital for clinical care, spa/aesthetic services, a research lab, consulting rooms, offices
Far West Gold Recoveries (FWGR) operation in Gauteng. FWGR is being rolled out in a phased approach. Phase 1 included early-stage production, involving upgrading the Driefontein 2 plant to process tailings from the Driefontein 5 dump at between 400 000 t and 600 000 t a month, and depositing the residue
Construction works for the Kyalami Circuit upgrades located on the corner of R55 and Allandale Road, Kyalami Estate, Midrand, Gauteng. The scope of works involve extended runoff areas at three critical corners of the track, along with enhancements to the Armco barriers to meet F1 safety standards. The
Construction of a 10ML Carlswald reservoir located on Walton Road in Midrand, Gauteng. The approximate GPS location has been placed along the proposed area of construction -25.979464, 28.097208