You are currently logged out and we are unable to show you directory results. Please Log in or Subscribe for ALL the information relating to your search.

Found 436 items with Total of 532 results

Advertising



Projects

OCP Green Water Pipeline
49
  • 33510
Construction of a pipeline distribution system (219km pipeline with a design capacity 80 million m³/ year, a 25.000 m³ basin and the pumping station at the Jorf Lasfar Industrial site), bringing desalinated water to the Khouribga phosphate mine zone in central Morocco. The project will contribute to


Projects

Salam City Desalination Plants, Egypt
46
  • 25356
Construction of the Port Said desalination plants in the Sinai Peninsula Egypt. The project involves the development of 4 desalination plants at a total cost of US$49.3 million.


Projects

Kofele - Kore - Bekoji and Arsi Negelle - Bilallo Junction
44
  • 34745
Construction of the Kofele - Kore - Bekoji and Arsi Negelle - Bilallo Junction, Ethiopia. Scope of works could include: Design and build contract for an asphalt road of 89.90km in length. The exact GPS location is not known and the Marker has been placed at Kofele 7.0766834, 38.7868342.


Projects

Jihur - Deneba - Lemi Megenteya - Guguftu - Wereilu - Degolo Road
43
  • 34748
Construction of the remaining works for the Jihur-Deneba-Lemi Megenteya-Guguftu-Wereilu-Degolo Road including the Guguftu-Wereilu-Degolo Road in Ethiopia. Scope of works could include: Upgrading of the 74.4 Km existing unpaved gravel road to a two-lane road with a 7.00m carriageway width. Asphalt concrete


Projects

Asmara Project, Eritrea
289
  • 9290
The Asmara Project approximately 700 square kilometres in central Eritrea, located immediately to the north, south and west of the capital city of Asmara in North Africa. The infrastructure is excellent with roads, power, water and airports servicing the project area. Sunridge has drilled over 250,000


Projects

Gimba - Tenta - Tenta Junction
45
  • 34749
Construction of the Gimba-Tenta-Tenta Junction in Ethiopia. Scope of works could include: Design and build contract for an asphalt road of 80.21km in length. The exact GPS location is not known and the Marker has been placed at Tenta, 11.3190186, 39.2505381.


Projects

Agaro - Gera - Medabo Road
45
  • 34747
Construction of Agaro-Gera-Medabo Road, including remaining works of the Beshasha-Medabo Road Project in Ethiopia. Scope of works could include: Design and build contract for an asphalt road of 82.55km in length. The exact GPS location is not known and the Marker has been placed at Agaro 7.8582451, 36.5817507


Projects

Terakimti Oxide Gold Project, Ethiopia
316
  • 9851
The Terakimti Project, also known as the Harvest Project, is proposed as an open pit mining operation followed by heap leaching and on site processing to produce gold-silver dore. The combination of near surface oxide gold and silver mineralization, hosted in soft rock when compared to other deposits,


Projects

Dandoko Gold Project, Mali
148
  • 18256
Four advanced gold anomalies, Bembala, Diabarou, Disse and Gombaly have been identified on the Dandoko license as targets. These targets are drill-ready. The Dandoko Gold proejct is located 134 km² in +40Moz, West Mali gold province in Mali, North Africa. It is located 30km from the Fekola deposi


Projects

Yanfolila Project, Mali
57
  • 24285
The Yanfolila project is located in southern Mali, 45km north of Avnel Gold’s Kalana gold mine (2.1Moz) and 35km east of Hummingbird Resources’ operating Komana gold mine (1.8Moz). First pass drilling at the Solona Main prospect in 2012 returned significant intersections including 26.5m at 3.59g/t gold

Advertising

Send me a Sample Based on these search results