Construction and the routine road maintenance of N2 Section 15 at km 0 to Section 16 at km 31.26 and N6 Section 1 from km 0 to km 32.33 and R72 Section 4 from km 9.90 to km 61.78 in East London, Eastern Cape. The project value is R 60 290 559,69. The approximate GPS location has been placed along the
Construction of the West Bank restitution phase 2, in Buffalo City Metropolitan Municipality, East London. CIDB 8CE. The exact co-ordinates are currently not available however the approximate area of location is Buffalo City, 33°00'50.4"S 27°54'13.7"E.
Upgrading of Road DR08598 between Elitheni Coal Mine (13.4km) and Road R56. The existing gravel road, which is approximately 13.4 kilometres long, is to be upgraded to a bituminous surfaced width applicable varying from 8.6m to 9.2m. There is one major structure on the project. The road pavement includes
Expansion of the departure lounge at King Phalo Airport, East London, Eastern Cape. Scope of work: Passenger Self-service Integration (Bag drop check-in, security boarding readers/gates and egates). Integration of new terminal with the existing terminal. Furnishings & finishes. Universal Design & Accessibility.
Dualling of National Route 2 from Brakfontein at km 27.4 to Kei Mouth at km 50.2 in the Amathole District Municipality and Buffalo City Metropolitan Municipality, Eastern Cape. The GPS co-ordinates have been placed just past the Brakfontein Interchange on the N2 32°53'22.7"S 27°59'07.9"E
Construction, design (including environmental permitting), build, install, test and commission of a 3MW solar photovoltaic plant that includes 1.5MWH battery energy storage system, at the Port of East London, Eastern Cape. CIDB 7EP. The exact GPS location is not known and the Marker has been placed at
Upgrading of 598 units for Peelton Cluster 1 which is part of the Drayini, Sixekweni and Kwatrain Rural Housing Project, in the Eastern Cape. The exact co-ordinates are currently not available however the approximate area of location is Peelton, 32°46'60.0"S 27°28'00.0"E .
Construction of the new Moyeni Police Station in Moyeni, Eastern Cape Province. The contract value is R 74 325 917,05. The GPS co-ordinates are 32°15'19.8"S 27°39'29.4"E.
Upgrading of the R72 Section 4 and MR501 Intersection at km 42.08 in Kidds Beach, near East London, Eastern Cape. The project value is R 75 860 000,00. The exact GPS location is not known and the marker has been placed at R72 intersection towards Kidds Beach 33°08'12.0"S 27°40'44.2"E.
Construction of the Squashville Housing project just outside Kei Road, along the R63, between Bhisho and Komga and falls within the Amahlathi Local Municipality, Eastern Cape. The contract value is R 1 040 400,00. This development will comprise of 153 RDP units. The exact GPS location is not known and