Construction of 320 residential units on Erf 1 & 2 of Portion 4 of the Farm Uitsig 208 IQ, Radiokop, Roodepoort, Gauteng. The site will be developed as two separate phases and will include the following: Erf 1 consists of 248 units with open and covered parking and Erf 2 consists of 72 units with open
Construction of the K148 Road, between K146 and K133, including the N3/K148 Interchange and bridge (approximately 6km), in Gauteng. R455 418 557.00. The exact co-ordinates are currently not available however the approximate area of location is 26°23'56.6"S 28°13'50.7"E
Upgrading of the existing Cleveland 88kV / 11kV Substation and associated equipment in Johannesburg, Gauteng. CIDB 8 R40 - R130 million.The exact co-ordinates are currently not available however the approximate area of location is Latitude -26.206845 Longitude 28.1137309
Sibanye completed a pre-feasibility study investigating the potential of solar power as an alternative source of electrical power to partially insulate the company from the effects of electricity supply interruptions from Eskom. The PFS confirmed that solar power provided an economically competitive
The upgrading of surfacing on National Route N17 Section 2, from N3 at km 3.0 to Tonk Meter at km 33.45, in the Ekuhurleni Metropolitan Municipality, Gauteng. The contract value is R607 450 619.79. The exact GPS co-ordinates are not known and the marker has been placed along the possible construction
Upgrades to the existing SANBS CK2 lab situated on Portion 1 of Erf 921, 1 Constantia Boulevard, Constantia Kloof, Roodepoort, Gauteng. CIDB 8GB. The upgrade of the Laboratory building (referred to as CK2) which entails the renewal of the existing building fabric, laboratories, offices, core structure,
Renovations at the EUCLID Mechanical and industrial Laboratories at the UNISA Florida Campus, 28 Pioneer Avenue, Florida Park, Roodepoort, Gauteng. CIDB 7GB. The scope of works is to extend the current mezzanine floor in both laboratories in order to cater for more enclosed labs as per the requirements
Construction of the Mitochondria Energy Campus to manufacture their Phoenix Fuel Cell System (the Solid Oxide Fuel Cell) at the Vaal Special Economic Zone in Rietspruit, Vaal, Gauteng. The campus 12 000m² will produce up to 250MW per annum at maximum production. The project value for phase 1 is estimated