Construction of Qitsi Bridge and associated roads located Dr A.B Xuma Local Municipality, Eastern Cape. CIDB Grading: 7CE. The exact location is unknown the marker has been placed at the municipal offices 31° 40' 30.23" S 27° 59' 47.26" E
Construction of the N2 Section 20 between the Msikaba Bridge and the Mtentu Bridge on the Wild Coast Toll Highway located in Eastern Cape. The project value is R 2 545 887 374,99. The exact GPS co-ordinates are currently not available however the marker has been placed as the Msikaba Bridge 31°17'20.5"S
Construction of the bulk sewer lines and pump stations for Mokhesi next to Sterkspruit as part of the RBIG Project in the Eastern Cape. Estimated value: R69 894 840.09. The GPS is placed at the Sterkspruit Water Treatment Works, 30°31'50.0"S 27°21'21.5"E.
Routine road maintenance of National Route R61 Section 8X from km 0 to km 17.27, Section 9 km 0 to km 73.79, Section 10 from km 0 to km 80.54 and National Route N2 Section 20 from km 0 to km 37.40, District Municipalities of OR Tambo and Alfred Nzo, Eastern Cape. The project value is R 108 238 855,60.
Coleskop Wind Power (Pty) Ltd is proposing to construct a wind energy facility (WEF) to be developed near Middelburg, Eastern Cape. REIPPP 5. The WEF will host a maximum of 32 wind turbines, each generating 5.5megawatts (MW) of power, with total combined potential power output of a maximum of 140MW.
Construction of new classrooms, refurbishment of existing buildings and demolition of mud / inappropriate structures at Mpozolo Senior Secondary School, Dutywa, Eastern Cape. The estimated project value is R40 million. Completion contract CIDB 7GB The GPS co-ordinates are 32°10'53.2"S 28°46'44.4"E.
Maintenance of National Route R62 Section 6 between the Western Cape and Eastern Cape border and Louterwater from km 36.75 to km 58.60, Kou-Kamma Local Municipality, Eastern Cape. CIDB 9CE The approximate GPS location has been placed along the proposed area of construction 33°47'25.1"S 23°38'07.3"E.
Construction of Mgomanzi Senior Primary School located in Mbizana, Eastern Cape. The project value is R 54 454 716,74 The exact co-ordinates are 30°56'02.0"S 29°50'56.8"E.
Development of a logistic sequencing facility for Daimler Truck Southern Africa within the East London Industrial Development Zone, Buffalo City Metropolitan Municipality, Eastern Cape. The facility will consist of the following; The onsite storage of diesel in above ground tanks with total monthly
Upgrading of Msobomvu Sports Ground, Phase 2, located in Mnquma Local Municipality, Butterworth, Eastern Cape. CIDB: 8GB/CE and 7GBPE/7CEPE The GPS co-ordinates are 32°19′33.34″ S 28°10′35.72″ E