Upgrades, additions and routine road maintenance of National Route 10 Sections 5 to 8 between Kopieskraal from km 31.322 and Omdraai Vlei at km 61.641 in the Pixley Ka Seme District Municipality, Northern Cape. The project value is R 107 661 724.40. The exact GPS location is not known and the marker
Construction and periodic maintenance of the National Route R27 Section 9 from Rietfontein at km 31 to Rietmond Poort at km 73, Hantam Local Municipality, Namakwa District Municipality, Northern Cape. The project value is R 99 147 250,00. The exact GPS location is not known and the Marker has been placed
The proposed Sishen Expansion Project at SIOM comprises of further pit expansions that include Far south pushback 21 and 19, Lylyveld pit expansion, C&G stockpile at Far south and Lylyveld pit, Moolmans workshop, access road and pollution control dam, proposed Far south Waste Rock Dump,heavy and light
Construction of grid connection infrastructure for the Zonnequa wind farm in the Northern Cape. The scope of works will include the construction of a collector substation, a double - circuit 132kV power line and infrastructure including access roads and laydown areas. This development traverses the following
Periodic maintenance and resurfacing of 31 km of National Route R27 Section 9 from Calvinia at km 0 to Rietfontein at km 31 in the Namakwa District Municipality and Hantam Local Municipality, Northern Cape. The project value is R 101 028 821,87. The GPS marker has been placed along the proposed route
Construction and maintenance on National Route R27 Section 7 and 8 from the Northern Cape/Western Cape border at km 41.12 to Calvinia at km 69.82 in the Local Municipality of Hantam Municipality, District Municipality of Namakwa in the Northern Cape. Estimated Value: R 310 914 000,00. The exact GPS location
Construction of the Khunab Solar Grid Connection on Portion 3 of the Farm McTaggarts Camp 453; Portion 12 of the Farm Klip Punt 452 and Olyvenhouts Drift Settlement Agricultural Holding 1080 in the Northern Cape. The grid connection solution will include specific grid connection infrastructure to cater
Construction of a wind energy facility and associated infrastructure, Kokerboom 1 wind farm in the Northern Cape. Kokerboom 1 wind farm is located on farm portions Leeuwberg Rivier (RE/1163) and Kleine Rooiberg (RE/227) approximately 50km North of Loeriesfontein, 85km West of Brandvlei and 160km southeast
Construction of a major dam on the Lower Orange River in the Northern Cape. The site is approximately 6km upstream of the Noordoewer and Vioolsdrift border post. The exact co-ordinates are currently not available however the marker has been placed near the Vioolsdrift border post 28°46'16.2"S 17°37'27.1"
Construction of 27km of subsurface sewer pipes as part of phase 2 of the Calvinia East Sewer Reticulation project located in the existing residential and CBD area of Calvinia, Northern Cape. The project vale is R 34 875 000,00. The GPS Co-ordinates are not available however, the marker has been placed