Reconstruction, deepening and lengthening of berths 203 to 205, at Durban Container Terminal (DCT), Pier 2 in Durban, KwaZulu-Natal. This expansion could increase the terminal's capacity from 2.4 million twenty-foot equivalent units (TEUs) to 2.9 million TEUs. GPS coordinates are: -29.883879, 31.015890.
Construction of civil infrastructure for various sites for Umlazi Zone 2 in Umlazi, KwaZulu-Natal. Estimated value R83 455 077.38. The scope of work comprises the construction of roads, footpaths, water, sewer, and storm water infrastructure. The project area can be accessed by travelling south along
Construction of uMngeni-uThukela Water Head Office upgrades, Phase 2 for the ground floor library and Phase 3 which is the ground floor and second floor at 310 Burger Street, Pietermaritzburg, Kwazulu-Natal. Estimated value of R29 134 395,90. The GPS co-ordinates are 29°36'11.8"S 30°23'06.0"E
Construction of a new skills development centre in Louwsburg, KwaZulu Natal. Value R106 239 362,56. Construction could consist of an administrative building facility block, workshops block, classrooms and laboratories, guardhouse and external work. The marker has been placed at the location of the site
Construction of a 100 bed student residence for the Howard Campus at the University of Kwazulu-Natal in Durban, KwaZulu-Natal. Estimated value R42 350 207.35. The GPS coordinates are 29°52'19.6"S 30°58'37.2"E
Periodic maintenance on National Route 2 Section 30 from Kangela at km 14.0 to km 44.0 in the District Municipality of Umkhanyakude and Local Municipality of The Big 5 Hlabisa/ Mtubatuba within KwaZulu-Natal. Estimated value of R263 278 944.00. The exact GPS is not known and the marker has been placed
Upgrade of National Route 3, Section 3, from Ashburton Interchange from km 1.5 to Murray Road at km 6.0. This project is in the province of KwaZulu-Natal and in the district municipality of uMgungundlovu. Value: R2 442 322 651.60 The exact co-ordinates are currently not available however the approximate
Reseal of Main Road P35-1 from km 0 to km 19.64 in Dundee, KwaZulu-Natal. The project value is R61 280 334.59. The scope of work comprises the reseal of 19,64km of the existing road and ancillary roadworks. Ancillary works will include the repair of existing guardrails, replacement of permanent road
Construction of the Buffalo (Mzinyathi) River bridge no. 3378 on the newly constructed Qudeni Link Road P752, in Mangeni, KwaZulu-Natal. R126 472 948.95.. The GPS co-ordinates are approximately 28°37'48.0"S 30°37'21.6"E