Construction of the 2 000 bed student accommodation building for the Sefako Makgatho Health Sciences University situated along Molotlegi Street, Ga-Rankuwa Zone 1, Ga-Rankuwa, Gauteng. Value of the project is estimated at R550 million. The approximate GPS location has been placed along the proposed area
Construction works for the structural walls and stormwater controls of the Spar North Rand Distribution Centre located on Axle Drive, Clayville Industrial, Olifantsfontein, Gauteng. The scope of works covers the civil works associated with new structural walls and stormwater controls and they are as
The upgrading of surfacing on National Route N17 Section 2, from N3 at km 3.0 to Tonk Meter at km 33.45, in the Ekuhurleni Metropolitan Municipality, Gauteng. The contract value is R607 450 619.79. The exact GPS co-ordinates are not known and the marker has been placed along the possible construction
Manufacturing of NCP vehicles in Isondo, Sasolburg, Gauteng. The exact details of the project location, scope and value is still to be confirmed. The GPS Coordinates have been placed in Isondo Lat -26.7895628 & Long 27.8495522
Construction of 8 x 2 level blocks of about 40 units each to accommodate approximately 364 students on 9 100m² located at Land is Wealth farm lodge, Sterkfontein, Gauteng. CIDB 8GB . The exact GPS Coordinates are 26°00'44.7"S 27°41'34.2"E.
Construction of the K148 Road, between K146 and K133, including the N3/K148 Interchange and bridge (approximately 6km), in Gauteng. R455 418 557.00. The exact co-ordinates are currently not available however the approximate area of location is 26°23'56.6"S 28°13'50.7"E
Upgrading of the existing Cleveland 88kV / 11kV Substation and associated equipment in Johannesburg, Gauteng. CIDB 8 R40 - R130 million.The exact co-ordinates are currently not available however the approximate area of location is Latitude -26.206845 Longitude 28.1137309
Sibanye completed a pre-feasibility study investigating the potential of solar power as an alternative source of electrical power to partially insulate the company from the effects of electricity supply interruptions from Eskom. The PFS confirmed that solar power provided an economically competitive
Construction of the Mitochondria Energy Campus to manufacture their Phoenix Fuel Cell System (the Solid Oxide Fuel Cell) at the Vaal Special Economic Zone in Rietspruit, Vaal, Gauteng. The campus 12 000m² will produce up to 250MW per annum at maximum production. The project value for phase 1 is estimated