You are currently logged out and we are unable to show you directory results. Please Log in or Subscribe for ALL the information relating to your search.

Found 1044 items with Total of 1067 results

Advertising



Projects

N2 Section 20 Msikaba Bridge to Mtentu Bridge
208
  • 26267
Construction of the N2 Section 20 between the Msikaba Bridge and the Mtentu Bridge on the Wild Coast Toll Highway located in Eastern Cape. The project value is R 2 545 887 374,99. The exact GPS co-ordinates are currently not available however the marker has been placed as the Msikaba Bridge 31°17'20.5"S


Projects

Elundini Rural Water Supply
155
  • 33616
Construction of the Elundini rural water supply in Mount Fletcher, Elundini Local Municipality, Eastern Cape. Project value: R18 726 792.49 VAT Incl. The scope of works will include: Construction of borehole pump stations, new storage tank/reservoir; associated rising mains; reticulation and stand pipes;


Projects

Motherwell Wind Energy Facility - Phase 2
227
  • 18930
Construction of a wind energy facility established on Portion 301 of Farm Bontrug, Brak River SW 224 and Grassridge 228, Eastern Cape and is expected to create a total footprint of 19 ha. This will include 26 turbines with a maximum output of 87 Mega Watts, an overhead power line (132kV distribution


Projects

Taylor Bequest Hospital WWTW
146
  • 32164
Repairs and upgrades to the existing Taylor Bequest Hospital waste water treatment works, located in Mount Fletcher, Eastern Cape. Estimated value of R 42 481 329.00 (Inclusive of Vat). The scope of works includes but is not limited to: Install 2 new elevated tank feeder pumps, including pipework and


Projects

Zalu Dam
360
  • 16237
Construction of the Zalu Dam on Xura River near Lusikisiki, in the Eastern Cape Province.


Projects

Taylor Bequest Hospital, Phase 1
289
  • 22092
Construction of new staff accommodation for Taylor Bequest Hospital, Phase 1 in Mount Fletcher, Eastern Cape. The project value is R 178 660 900,52. The exact co-ordinates are 30°41'22.0"S 28°30'36.3"E.


Projects

Mt Fletcher Social Cluster Offices
483
  • 12953
Construction of Social Cluster Offices for the Department of Education and Social Offices: Phase 1 in Mount Fletcher, Eastern Cape. CIDB 8GB. The exact GPS location is not known and the marker has been placed at the clarification meeting site, Department of Education Offices: 30°41'25.2"S 28°30'28.5"E


Projects

Ntamonde Police Station
370
  • 13946
Construction of the new Ntamonde Police Station on Portion 13 of the farm Ntshangase No. 63 SG, in the Eastern Cape Province. A Marker has been placed at 32°14'17.3"S 28°50'33.6"E


Projects

Upgrading of Road DR08598 between Elitheni Coal Mine (13.4km) and Road R56
248
  • 10504
Upgrading of Road DR08598 between Elitheni Coal Mine (13.4km) and Road R56. The existing gravel road, which is approximately 13.4 kilometres long, is to be upgraded to a bituminous surfaced width applicable varying from 8.6m to 9.2m. There is one major structure on the project. The road pavement includes


Projects

Moyeni Police Station
743
  • 10741
Construction of the new Moyeni Police Station in Moyeni, Eastern Cape Province. The contract value is R 74 325 917,05. The GPS co-ordinates are 32°15'19.8"S 27°39'29.4"E.

Advertising

Send me a Sample Based on these search results