Periodic maintenance on National Route 12 Section 5 from Three Sisters at km 0.0 to Victoria West at km 60.80, Pixley ka Seme District and Local Municipality, Northern Cape. The exact GPS location is not known and the marker has been placed on N12 along the construction route 31°52'50.5"S 23°04'56.3"E
Upgrading of National Route 380 Section 2 from Santoy from km 8.40 to McCarthy’s Rest at km 118.46 from gravel to surfaced in the District Municipality of John Taolo Gaetsewe and the Local Municipality of Joe Morolong, Northern Cape. The GPS marker has been placed along the proposed construction route
Rehabilitation of Berwick 341 asbestos mine located in the Joe Morolong Local Municipality in the Northern Cape. CIDB 7CE GPS co-ordinates: 26°24'16.98"S and 23° 4'49.75"E
Periodic maintenance on National Route 10 Section 8 from Britstown at km 0.00 to Schilders Pan at km 61.64 in the Pixely ka Seme District Municipality, Northern Cape. The GPS marker has been placed along the proposed construction route 30°27'07.8"S 23°22'38.8"E.
Construction of the Engineering Operations Centre (EOC) for the South African Radio Astronomy Observatory (SARAO) at Klerefontein, Northern Cape. The project value is R 302 635 800,36. The scope of works will include: SARAO will require the services of various specialists (Architectural including Structural)
Upgrades, additions and routine road maintenance of National Route 10 Sections 5 to 8 between Kopieskraal from km 31.322 and Omdraai Vlei at km 61.641 in the Pixley Ka Seme District Municipality, Northern Cape. The project value is R 107 661 724.40. The exact GPS location is not known and the marker
The proposed Sishen Expansion Project at SIOM comprises of further pit expansions that include Far south pushback 21 and 19, Lylyveld pit expansion, C&G stockpile at Far south and Lylyveld pit, Moolmans workshop, access road and pollution control dam, proposed Far south Waste Rock Dump,heavy and light
Construction of grid connection infrastructure for the Zonnequa wind farm in the Northern Cape. The scope of works will include the construction of a collector substation, a double - circuit 132kV power line and infrastructure including access roads and laydown areas. This development traverses the following
Construction of the Black Rock solar photovoltaic facility at the Assmang Black Rock mine operations in Santoy, Northern Cape. The exact GPS location is not known and the marker has been placed at Black Rock Mine -27.1333064, 22.8332709.
Construction of the 140MW Teekloof wind energy facility in the Ubuntu Local Municipality and the Pixley KaSeme District Municipality, 25km south from Victoria West, 40km north from Murraysburg and 40km west from Richmond in the Northern Cape. The exact co-ordinates are currently not available however