Construction of the Loperberg Wind Farm on Bushman’s Hoek no.3, portion 6 and 7 of the Farm Paardekraal 64, portion 1 and 3 and the remaining extent of the Farm Uitkeyk no. 67, portion 1, 2, 3, 4, 5 and 9 of Farm Cypher Gat no. 69, Molteno, Eastern Cape. The GPS has been placed on farm Paardekraal 64.
Construction of the Malabar Wind Farm on portion 1 and portion 6 and on the remaining extent of the farm Cypher Gat 69, the farm Highlands no. 72, portion 1 and 4 of farm Tol Kop 84, and the farm Post Houers Hoek 96, Molteno, Eastern Cape. The GPS has been placed on farm Cypher Gat 69 at 31°27'56.3"S
Upgrading of Road DR08598 between Elitheni Coal Mine (13.4km) and Road R56. The existing gravel road, which is approximately 13.4 kilometres long, is to be upgraded to a bituminous surfaced width applicable varying from 8.6m to 9.2m. There is one major structure on the project. The road pavement includes
Construction of the new Moyeni Police Station in Moyeni, Eastern Cape Province. The contract value is R 74 325 917,05. The GPS co-ordinates are 32°15'19.8"S 27°39'29.4"E.
Upgrading of the R72 Section 4 and MR501 Intersection at km 42.08 in Kidds Beach, near East London, Eastern Cape. The project value is R 75 860 000,00. The exact GPS location is not known and the marker has been placed at R72 intersection towards Kidds Beach 33°08'12.0"S 27°40'44.2"E.
The Xolobeni project is regarded as one of the largest undeveloped mineral sands resources in the world, containing more than nine-million tons of ilmenite. The proposed Xolobeni mineral sands project will be a dry-mining operation as the area being mined is relatively small. Between 13 million tons
Construction of the N2 Section 20 between the Msikaba Bridge and the Mtentu Bridge on the Wild Coast Toll Highway located in Eastern Cape. The project value is R 2 545 887 374,99. The exact GPS co-ordinates are currently not available however the marker has been placed as the Msikaba Bridge 31°17'20.5"S
Construction of a wind energy facility established on Portion 301 of Farm Bontrug, Brak River SW 224 and Grassridge 228, Eastern Cape and is expected to create a total footprint of 19 ha. This will include 26 turbines with a maximum output of 87 Mega Watts, an overhead power line (132kV distribution
Construction of conventional two double storey buildings approximately 1 659m² and 2 384m², complete with piling foundations, concrete beams & columns, superstructure brickwork and timber trusses with klip Iock roof sheeting complete will a passenger lift as well as alterations and additions to existing