Construction of a pump station, bulk sewer upgrading and sewer line connection in Mamelodi Ext 6 Phomolong, south-east of Mamelodi Gardens Township, Pretoria, Gauteng. The contract value is R43 730 624.58. The scope of works entails the construction of a sewer pump station to allow the 21L/s sewage
Refurbishment of the existing Greenview Station located in Mamelodi, Pretoria, Gauteng. CIDB 8GB. The scope of work will include but is not limited to repair, construct and complete all outstanding concrete, formwork and make provision for reinforcement where necessary, repair and complete all plastering
Completion of Babelegi 15ML reservoir, water tower, pump station and bulk pipeline in Ramotse, Gauteng. R36 770 208,70 (Incl VAT). The exact GPS Coordinates are 25°22'47.0"S 28°17'53.1"E
Manufacturing of NCP vehicles in Isondo, Sasolburg, Gauteng. The exact details of the project location, scope and value is still to be confirmed. The GPS Coordinates have been placed in Isondo Lat -26.7895628 & Long 27.8495522
Construction of 8 x 2 level blocks of about 40 units each to accommodate approximately 364 students on 9 100m² located at Land is Wealth farm lodge, Sterkfontein, Gauteng. CIDB 8GB . The exact GPS Coordinates are 26°00'44.7"S 27°41'34.2"E.
Completion works for the existing incomplete Lusaka Clinic located on Erf 37313 and 38072, 171 Letsogo Street, Mamelodi Extension 22, Mamelodi, Pretoria, Gauteng. CIDB 7GB. The scope of an outstanding work for construction consists of the following, external layerworks, plumbing work, Internal doors,
Sibanye completed a pre-feasibility study investigating the potential of solar power as an alternative source of electrical power to partially insulate the company from the effects of electricity supply interruptions from Eskom. The PFS confirmed that solar power provided an economically competitive
Construction of the Mitochondria Energy Campus to manufacture their Phoenix Fuel Cell System (the Solid Oxide Fuel Cell) at the Vaal Special Economic Zone in Rietspruit, Vaal, Gauteng. The campus 12 000m² will produce up to 250MW per annum at maximum production. The project value for phase 1 is estimated