Construction of warehouses on Erf 243 and Erf 247 S&J Industrial Estate, Amalthea Road, Elandsfontein, Germiston, Gauteng. The scope of works involves construction of two new warehouses with offices (9 x blocks in total) measuring 45 450m² combined. Erf 243 is for Section 1 and will comprise of Blocks
Construction of the Brickfield Industrial Park located on 1 Brickfield Road, Meadowdale, Germiston, Gauteng. The development stand offers 42 000m² in extent and can support a 20 000m² facility, that can offer a 1500m² double volume office component with ample parking or a 19 850m² warehouse with multiple
Civil and services installation at the existing Scania Hilltop facility on Erf 126 Henville, Ext 10 at the corner of Reef Road and Sam Green Road, Sunnyridge, Germiston, Gauteng. The scope of works: General bulk earthworks, road subgrade earthworks, stormwater drainage, concrete works, roads, segmented
Construction of the K148 Road, between K146 and K133, including the N3/K148 Interchange and bridge (approximately 6km), in Gauteng. R455 418 557.00. The exact co-ordinates are currently not available however the approximate area of location is 26°23'56.6"S 28°13'50.7"E
Upgrade of National Road 3 Section 12 from Dwars in Die Weg at km 13.5 to Heidelberg Road at km 25.5 in Germiston, Gauteng. The exact GPS co-ordinates are not known so the marker has been placed at the Geldenhuys Interchange on the route 26°10'32.2"S 28°20'01.4"E
Upgrading of the existing Cleveland 88kV / 11kV Substation and associated equipment in Johannesburg, Gauteng. CIDB 8 R40 - R130 million.The exact co-ordinates are currently not available however the approximate area of location is Latitude -26.206845 Longitude 28.1137309
Sibanye completed a pre-feasibility study investigating the potential of solar power as an alternative source of electrical power to partially insulate the company from the effects of electricity supply interruptions from Eskom. The PFS confirmed that solar power provided an economically competitive
The upgrading of surfacing on National Route N17 Section 2, from N3 at km 3.0 to Tonk Meter at km 33.45, in the Ekuhurleni Metropolitan Municipality, Gauteng. The contract value is R607 450 619.79. The exact GPS co-ordinates are not known and the marker has been placed along the possible construction
Construction of the Mitochondria Energy Campus to manufacture their Phoenix Fuel Cell System (the Solid Oxide Fuel Cell) at the Vaal Special Economic Zone in Rietspruit, Vaal, Gauteng. The campus 12 000m² will produce up to 250MW per annum at maximum production. The project value for phase 1 is estimated