Upgrading of Tshino access road located in Makhado Municipality, Limpopo. CIDB 8CE. The scope of work includes Earthworks or excavation for the road layers. Construction of In-Situ roadbed layer. Construction of the sub-base layer using borrow pit imported material. Construction of the base-layer using
The Makhado coal project which MC Mining has a 100% interest in is situated north of Soutpansberg, 60km from Musina in the Limpopo Province, close to Rio Tinto’s Chapudi Project. The Makhado Colliery will be an opencast mine producing both domestic and export grade coal. The life of mine is expected
Producing an estimated 744 000oz of platinum, palladium, rhodium and gold a year, the Waterberg project in Limpopo will be one of the large PGM mine complexes in South Africa. The PFS envisages a low-cost, mutli-decline, fully mechanized mining complex along an initial 13km deposit strike, with two 300
Upgrading of 5km internal street from gravel to surfacing from Sekonye to Springs in Molemole Local Municipality, Limpopo. CIDB 7CE. The exact GPS co-ordinates are unknown the marker has been placed a the local municipality office 23°22'8.01"S 29°19' 36.36"E
Replacement of the 4000m bulk raw water AC pipeline to uPvc from the Lapa pump station to Bela-Bela water treatment works for Ward 1 and 9 in Bela Bela Local Municipality, Limpopo . CIDB 7CE. The GPS coordinates for the Lapa pump station and Bela-Bela water treatment works are 24°52'7.22"S 28°15'35.49"E
The Mopane Mining Project is situated 40 km (direct) and 63km (via road) north of the town Makhado and 7 km west of Mopane in the Musina and Ma-khado Local Municipal areas, Vhembe District, Limpopo. It is contiguous to the Makhado Project in the Limpopo Province and has a total resource of 7.2 billion
Construction of Mashoshing Road in Hoedspruit, Limpopo. CIDB 7CE. The exact GPS location is not known and the Marker has been placed at Maruleng Municipality Office, co-ordinates -24.3527429, 30.9475777
Upgrading of the Settlers sewer pump station in Ward 2 in Bela-Bela township, Bela-Bela, Limpopo. Project value of R22 848 913,57. Scope of works could include but is not limited to: Construction of new pump house adjacent and connecting to existing infrastructure, upgrade of screening system and inlet
Construction of the 80MW Lephalale solar photovoltaic (PV) farm near the Grootegeluk coal mine Limpopo. Phase 1 involves the construction of 80 MW solar PV plant to supply Exxaro's Grootgeluk coal mine. In phase 2, storage is expected to be added. The project will be designed for future expansion. Estimated