Completion of Babelegi 15ML reservoir, water tower, pump station and bulk pipeline in Ramotse, Gauteng. R36 770 208,70 (Incl VAT). The exact GPS Coordinates are 25°22'47.0"S 28°17'53.1"E
Upgrades and refurbishments of the existing Hoërskool Centurion, situated at 118 Selborne Avenue, Lyttelton Manor, Centurion, Gauteng. CIDB 7CE. The scope of works involves enabling works (Phase 1): demolitions and upgrades, construction works (Phase 2): stormwater and associated services, construction
Construction of new Amatola Office Development on Erf 1403, 14 Amatola Road, Doringkloof, Centurion, Gauteng. The scope of work involves demolition of existing residential building and the construction of new 912m² office building consisting of two floors including (but not limited to) bulk earthworks,
Construction of the Isuzu Trucks Centurion dealership located on Erf 778, Centurion on Lenchen Avenue, Centurion, Pretoria, Gauteng. The scope of work involves construction of Isuzu Trucks Centurion with parking comprising concrete and steel structure, chromadeck roof sheeting, brick perimeter walls
Far West Gold Recoveries (FWGR) operation in Gauteng. FWGR is being rolled out in a phased approach. Phase 1 included early-stage production, involving upgrading the Driefontein 2 plant to process tailings from the Driefontein 5 dump at between 400 000 t and 600 000 t a month, and depositing the residue
Construction of the 2 000 bed student accommodation building for the Sefako Makgatho Health Sciences University situated along Molotlegi Street, Ga-Rankuwa Zone 1, Ga-Rankuwa, Gauteng. Value of the project is estimated at R550 million. The approximate GPS location has been placed along the proposed area
Construction of civils and services for the new Eldoraigne Shopping Centre located on stand 356 (Portion 468 of portion 24), and the corner of Wierda Road and Saxby Avenue, Centurion, Gauteng. The scope of works involve bulk earthworks, works associated with sewer, water and stormwater layouts, fencing
Construction of the new Eldoraigne Shopping Centre located on stand 356 (Portion 468 of portion 24), on the corner of Wierda Road and Saxby Avenue, Centurion, Gauteng. The GPS coordinates are -25.831876980874398, 28.14621750258676
Construction of the Mitochondria Energy Campus to manufacture their Phoenix Fuel Cell System (the Solid Oxide Fuel Cell) at the Vaal Special Economic Zone in Rietspruit, Vaal, Gauteng. The campus 12 000m² will produce up to 250MW per annum at maximum production. The project value for phase 1 is estimated
Construction of K101 from Rooihuiskraal (Brakfontein Road) to D795 (approximately 5.4km), Centurion, Gauteng. Value of R525 579 226.91. The exact co-ordinates are currently not available however the approximate area of location is on the K101 25°51'50.5"S 28°05'19.9"E