Construction of a new greenfield and deep-water port with associated infrastructure as well as a new rail link connecting the port to the mining and industrial hubs in the Northern Cape. The GPS Coordinates have been placed at Boegoebaai 29°14'21.6"S 16°51'17.5"E.
Upgrades, additions and routine road maintenance of National Route 10 Sections 5 to 8 between Kopieskraal from km 31.322 and Omdraai Vlei at km 61.641 in the Pixley Ka Seme District Municipality, Northern Cape. The project value is R 107 661 724.40. The exact GPS location is not known and the marker
Periodic Maintenance on National Route 8 Section 6 from Waterford at km 45.00 to Volop at km 90.00, Siyancuma Local Municipality, Pixley ka Seme District Municipality, Northern Cape. The project value is R 55 338 000,00. The approximate GPS location has been placed along the proposed area of construction
The proposed Sishen Expansion Project at SIOM comprises of further pit expansions that include Far south pushback 21 and 19, Lylyveld pit expansion, C&G stockpile at Far south and Lylyveld pit, Moolmans workshop, access road and pollution control dam, proposed Far south Waste Rock Dump,heavy and light
Construction of grid connection infrastructure for the Zonnequa wind farm in the Northern Cape. The scope of works will include the construction of a collector substation, a double - circuit 132kV power line and infrastructure including access roads and laydown areas. This development traverses the following
Construction of 2 x 200MW photovoltaic solar energy facilities, including 2 x 40MW battery energy storage system and associated infrastructure on portion 1 of the Farm Droogfontein No 62 approximately 20km north of Kimberley, Northern Cape. The exact GPS coordinates are 28°34'31.3"S 24°42'17.9"E
Construction on the 75MW Khoi-Sun Development photovoltaic renewable energy facility and associated infrastructure on a portion of Farm 426, Skuitdrift, adjacent to the Schuitdrift Substation, approximately 106km northeast of Pofadder and 115km northwest of Kakamas, in the Northern Cape. The exact co-ordinates
Construction of the Paulputs 300MW Wind Energy Facility and the associated infrastructure approximately 50 km (centre point of the site) northeast of Pofadder and approximately 80 km northwest of Kakamas in the Northern Cape. The scope of works also includes a 132 KV grid connection. The development
Construction of a 200 MW concentrated solar power project and associated infrastructure (using Solar Thermal Electric (STE) Molten Salt Tower (MST) technology). The project development site is located on portion 4 of the farm Scuitklip 92 which is located approximately 45 km north-east of Pofadder within
Construction of a a 30MW solar photovoltaic plant for Vedanta Zinc International’s Black Mountain Mining operations in the Northern Cape. The works will be undertaken on a build, own, operate and maintain basis. The exact GPS location is not known and the Marker has been placed at Black Mountain Mining