Construction of new structures for phase two at Sidlamafa Secondary School located on Erf 294 KaMhlushwa-A Township, Nkomazi Local Municipality, Mpumalanga. Value of R81 861 094,23. The GPS marker has been placed at the school 25°39'38.0"S 31°41'04.0"E
Upgrading of the existing Mpuluzi wastewater treatment works, Phase 2, located near Carolina, Mpumalanga. The Value of R54 680 509,26. The envisaged scope of work to be carried out under this project to upgrade the Mpuluzi WWTW with an additional 2 Ml/day capacity which will entail the construction of
Construction of the Nebbi-Arua Road measuring 80kms in Nebbi Northern Uganda. Scope of works could include: construction of a high standard bituminous surfaced road to replace the existing gravel road. The exact GPS location is not known and the Marker has been placed at 2.4814613, 31.0907238.
Alterations and additions to the Bellville Fleet Facility, located at 26 Reed Street, Bellville, Cape Town, Western Cape. The project value is R 26 535 279,00. The GPS co-ordinates are 33°54'14.3"S 18°38'17.3"E
The Steenkampskraal project is located almost 70km north of Vanrhynsdorp in the Western Cape and is expected to be one of the first rare-earth mines to be developed outside China. The Steenkampskraal mine was a high grade from producer with a known process for recovering rare earths. The total capital
The project is located 270 kilometres south-west of Kimberley, the regional capital of the Northern Cape province. Importantly, the project has access to significant local and regional infrastructure, with mine infrastructure including a regional power grid feed, bitumen access roads, access to a bulk,
Construction of the luxury apartment development known as The Bridges, located at Ratanga Park off Sable Road in Century city, Cape Town, Western Cape. The 106 luxury apartments are available in a mix of studios, one, two and three-bedroom apartments and penthouses. There will also be a clubhouse and
Construction of The Richards West Residential Apartments located on 500 Richards Drive, Halfway House, Midrand, Gauteng. The development is made of various 4 storey residential blocks that comprise of bachelors (36m²), 1 bed and 1 bath (42m²) 2 bed and 1 bath (57m²) as well as 2 bed and 2 bath (66m²)
Widening, improvement, operation and maintenance of various sections of highway between Nairobi and Mau Summit in Kenya. Project value is set to be Sh175 billion. The scope of works includes: (i) Widening of 175km of the A8 highway between Rironi and Mau Summit to become a 4 lane dual carriageway; (ii)
Upgrades to the existing SANBS CK2 lab situated on Portion 1 of Erf 921, 1 Constantia Boulevard, Constantia Kloof, Roodepoort, Gauteng. CIDB 8GB. The upgrade of the Laboratory building (referred to as CK2) which entails the renewal of the existing building fabric, laboratories, offices, core structure,