Construction of Kwahlokohloko SSA 1 Bulk Water Supply phase 2C in Eshowe, KwaZulu-Natal. Value: R49 860 030.22. Scope of works includes the construction of a 1.5Ml reservoir at Mpehlele hill with associated pipework. GPS coordinates: -28.827114 ;31.522736
Construction of the Motantanyane water supply Phase 1: Contract B, Motantanyane, Limpopo. The project value is R56 746 250,00. The exact GPS location is not known and the Marker has been placed at Sefako Makgatho Fire station, Lebowakgomo Zone F (next to Complex) 24°18’29.31”S 29°29’14.19 “E.
Upgrading from gravel to surface standard of road D201 as well as appurtenant works, from Pampierstad to Matlapeng - Phase 1 - 24km in the North West. The contract value is R148 798 228,84 (Incl VAT). The exact GPS location of the construction site is currently unavailable, we have placed the GPS marker
Construction of new facilities and substitution of mobile structures at Langa Secondary School in Boschfontein, Nkomazi, Ehlanzeni District, Mpumalanga. Estimated value of R48 965 071,97. The GPS coordinates of the school are 24°44'57.2"S 31°13'16.7"E
Upgrading of the no. 6 sewage pump station and construction of a rising new main in Thembalethu, Western Cape. The project value is R 95 369 423,67. The GPS location is 34°01'14.7"S 22°29'25.1"E.
Construction of uMngeni-uThukela Water Head Office upgrades, Phase 2 for the ground floor library and Phase 3 which is the ground floor and second floor at 310 Burger Street, Pietermaritzburg, Kwazulu-Natal. Estimated value of R29 134 395,90. The GPS co-ordinates are 29°36'11.8"S 30°23'06.0"E
Construction of a residential development on erf 1855 in Kreft Street, Annlin, Pretoria, Gauteng. The project consists of 84 residential units of +-60m² per unit and will be constructed in 2 phases. Phase 1 consist of 6 blocks and 42 units. Phase 2 will consist of 5 blocks and 42 units. This development
Construction of Mshengo RDP section internal streets and stormwater, Mshengo, Phalaborwa, Limpopo. Value of contract R24 258 020.04 The exact GPS location is not known and the Marker has been placed at Mogalakwena Local Municipality offices: 24°10'58.6"S 29°00'34.3"E.
Upgrade of infrastructure at the Sturrock Dry Dock at the Port of Cape Town, Western Cape. R 32 135 246.93. The GPS co-ordinates are: -33.90428, 18.4300599
Construction of the internal street and stormwater control in Phagameng Ext 8 in the Modimolle-Mookgophong Local Municipality, Limpopo. CIDB 7CE. The exact location is not known and the marker has been placed at the Mookgopong Municipality Office 24°30'55.8"S 28°42'44.0"E