You are currently logged out and we are unable to show you directory results. Please Log in or Subscribe for ALL the information relating to your search.

Found 1735 items with Total of 1962 results

Advertising



Projects

Kwahlokohloko SSA 1 BWS - Phase 2C
115
  • 28861
Construction of Kwahlokohloko SSA 1 Bulk Water Supply phase 2C in Eshowe, KwaZulu-Natal. Value: R49 860 030.22. Scope of works includes the construction of a 1.5Ml reservoir at Mpehlele hill with associated pipework. GPS coordinates: -28.827114 ;31.522736


Projects

Motantanyane WS, Phase 1: Contract B
140
  • 33599
Construction of the Motantanyane water supply Phase 1: Contract B, Motantanyane, Limpopo. The project value is R56 746 250,00. The exact GPS location is not known and the Marker has been placed at Sefako Makgatho Fire station, Lebowakgomo Zone F (next to Complex) 24°18’29.31”S 29°29’14.19 “E.


Projects

Upgrading of Road D201
130
  • 27092
Upgrading from gravel to surface standard of road D201 as well as appurtenant works, from Pampierstad to Matlapeng - Phase 1 - 24km in the North West. The contract value is R148 798 228,84 (Incl VAT). The exact GPS location of the construction site is currently unavailable, we have placed the GPS marker


Projects

Langa SS
143
  • 31640
Construction of new facilities and substitution of mobile structures at Langa Secondary School in Boschfontein, Nkomazi, Ehlanzeni District, Mpumalanga. Estimated value of R48 965 071,97. The GPS coordinates of the school are 24°44'57.2"S 31°13'16.7"E


Projects

Thembalethu Sewage Pumpstation No 6
157
  • 32472
Upgrading of the no. 6 sewage pump station and construction of a rising new main in Thembalethu, Western Cape. The project value is R 95 369 423,67. The GPS location is 34°01'14.7"S 22°29'25.1"E.


Projects

Umgeni Water Head Office Upgrades
138
  • 31853
Construction of uMngeni-uThukela Water Head Office upgrades, Phase 2 for the ground floor library and Phase 3 which is the ground floor and second floor at 310 Burger Street, Pietermaritzburg, Kwazulu-Natal. Estimated value of R29 134 395,90. The GPS co-ordinates are 29°36'11.8"S 30°23'06.0"E


Projects

Thornwood Place
134
  • 32445
Construction of a residential development on erf 1855 in Kreft Street, Annlin, Pretoria, Gauteng. The project consists of 84 residential units of +-60m² per unit and will be constructed in 2 phases. Phase 1 consist of 6 blocks and 42 units. Phase 2 will consist of 5 blocks and 42 units. This development


Projects

Mshengo RDP Section, Internal Streets
125
  • 34193
Construction of Mshengo RDP section internal streets and stormwater, Mshengo, Phalaborwa, Limpopo. Value of contract R24 258 020.04 The exact GPS location is not known and the Marker has been placed at Mogalakwena Local Municipality offices: 24°10'58.6"S 29°00'34.3"E.


Projects

Sturrock Dry Dock Infrastructure Upgrade
140
  • 28868
Upgrade of infrastructure at the Sturrock Dry Dock at the Port of Cape Town, Western Cape. R 32 135 246.93. The GPS co-ordinates are: -33.90428, 18.4300599


Projects

Phagameng Ext 8 Internal Street & Stormwater
124
  • 32788
Construction of the internal street and stormwater control in Phagameng Ext 8 in the Modimolle-Mookgophong Local Municipality, Limpopo. CIDB 7CE. The exact location is not known and the marker has been placed at the Mookgopong Municipality Office 24°30'55.8"S 28°42'44.0"E

Advertising

Send me a Sample Based on these search results