Construction of a solar Photovoltaic farm at Pointe aux Sables with a capacity of 9.9 MWac over an extent of land 134,387m2 (31.84Arpents) in Mauritius. The Solar Photovoltaic Farm at Petite Riviere will comprise of 18,216 monocrystalline Bifacial N-type panels. PV panels of make Jinko Solar have been
Construction of a 300MW solar photovoltaic and battery energy storage system project located in the Tete Province of Mozambique. Phased construction of the project can deliver first power up to 60MW within 18 months, with 300MW deliverable over 28 months. The exact co-ordinates are currently not available
Construction of secondary roads at the Waterfall Cemetary, located in Waterfall City, Midrand, Gauteng. The exact GPS co-ordinates are 6°02'26.6"S 28°08'13.1"E.
Construction of a 100-room (200-bed) safari lodge just north of the Phalaborwa Gate within the boundaries of the Kruger National Park in Mpumalanga. The term will be for 25 years and will require equity participation by successful land claimants. GPS marker has been placed at the Phalaborwa Gate 23°56'44.9"S
Construction of the N380: Muagamula - Xitaxi for distance of 25 km in Mozambique. The approximate GPS location has been placed along the proposed area of construction -11.8143732, 40.0252191.
Construction of a self generation (behind the meter) solar PV facility with a capacity of up to 25MW within the Middelburg Mine Services coal mine footprint to supply energy to the water reclamation plant on Portion 9 of the Farm Hartbeesfontein 339, approximately 18km south of the town of Middelburg,
Expansion of the Tanger Med Port in Tangier, Morocco. The projects involves the expansion of the passenger and truck port which will cover a total area of 62.92 hectares. The GPS coordinates are 35.8704299, -5.5199398
Expansion on the Eastgate Airport on portion 01 of Farm Suikerkop 62 KU and portion 01 of Farm Casketts 72KU near Hoedspruit, Limpopo. The proposed development will entail of the expansion of the existing airport inclusive of an additional taxiway and terminal building, new access road, parking lot,
The Egoli Project is a long life, low cost brownfield project in Evander, Mpumalanga. The project has an initial life of mine of 9 years, with annual gold production of approximately 72koz at an average head grade of 6.61g/t (LOM gold production of 17,771 kg (c.570koz)). First gold is expected to be