Project overview
About this development
Construction of infrastructure and reservoir for the proposed 200MWh capacity Waaihoek Battery Energy Storage System located within the Waaihoek WEF project site located south-east of Utrecht, in the eMadlangeni Local Municipality, Amajuba District Municipality, KwaZulu-Natal. The reservoir will be built on well compacted 150-250mm thick G5 material. The sides will be corrugated iron lined with sail, which is bound with 5mm steel cable 6 rings on the outside. Measurements will be 2.5m high, 15m diameter which contains 400 000 litres of water (400m³). Estimated GPS coordinates: -27.703503, 30.361487
Project at a glance
Waaihoek Battery Energy Storage System - Please see PPA 12668 is located in Utrecht. The project is classified in the Private sector. Its current recorded stage is Cancelled.