Project overview
About this development
Construction of water and sewer infrastructure in Zone 3 and 4 of the Coega SEZ, in Gqeberha, Eastern Cape. The project value is R 132 842 793,53. The scope of works includes: Construction of a Ø630mm connection including bulk water meter chamber from the Ø750mm bulk water supply line to Zone 3. Construction of approximately 6280m of uPVC water reticulation pipes to upgrade and extend the existing network in Zone 3 (ranging between Ø200mm to Ø630mm). Construction of approximately 7380m of uPVC water reticulation pipes to cater for future developments in Zone 4 (ranging between Ø250mm to Ø400mm). Construction of a Ø630mm heavy-duty underground PVC sewer outfall line up to 9m deep along the existing Ø450mm sewer outfall line. Construction of approximately 8455m of heavy-duty underground PVC sewer pipes along existing sewer network to replace the existing network in Zone 3 (ranging between Ø200mm to Ø630mm). Construction of approximately 8072m of heavy-duty underground PVC sewer pipes to cater for future developments in Zone 4 (ranging between Ø200mm to Ø500mm). The exact GPS co-ordinates are not available so the marker has been placed at the CDC’s Main Office 33°47'46.9"S 25°40'05.0"E
Project at a glance
Coega SEZ Zone 3 & 4 Water & Sewer Infrastructure is located in Gqeberha (Port Elizabeth). The project is classified in the Public sector. Its current recorded stage is L2B Shelved. The recorded project value is R 61 Million - R 200 Million.