Project overview
About this development
Development of Umsinde Emoyeni Wind Energy Facility (WEF) Phase 1, and associated infrastructure including grid connection infrastructure, located near the town of Murraysburg in the Western Cape. Each WEF development phase will comprise up to 32 wind turbines, with each turbine having an installed generation capacity of between 1.5 and 3.5 megawatts (MW). Turbines with a maximum height to blade tip of 180 m will be considered (a hub height up to 120 m, rotor diameter up to 130 m). Both Phase 1 and Phase 2 of the WEF will be located within the WEF site boundary. The exact co-ordinates are currently not available however the marker has been placed near Murraysburg 31°58'25.0"S 23°48'26.6"E.
Project at a glance
Umsinde Emoyeni Wind Energy Facility - Phase 1 is located in Murraysburg. The project is classified in the Private sector. Its current recorded stage is Underway. The recorded project value is R 200 Million+.