AfriTin Mining has completed the detailed mine design at its flagship asset Uis tin mine, in Namibia. Following the completion of a mapping programme and construction of a three-dimensional geological model, AfriTin undertook a detailed mine design for the V1 and V2 pegmatite bodies at the site, which were previously identified as priority targets to supply feed to the company’s intermediary processing plant. The mine design includes an initial five-year mine production schedule to start operations on the outcropping pegmatite bodies and existing excavations of the historical V1 and V2 pits. Material will be liberated through drilling and blasting, while excavators and articulated dump trucks will be used to load and haul the ore. GPS coordinates lat: -21.2175306; long: 14.8813411.
Project at a glance
Uis Tin Project, Namibia is located in Namibia. The project is classified in the Private sector. Its current recorded stage is Procedural. The recorded project value is R 200 Million+.