Construction of Phase 2B for the replacement of the Tlhabane asbestos-cement water pipes in Tlhabane, North West. CIDB 8CE. Scope of works to include: Trenching, bedding and backfilling for the following: Pipes • 50mm (HDPE) 5.0 km • 75mm (uPVC) 3.6 km • 110mm (uPVC) 3.0 km • 160mm (uPVC) 2.8 km • 200mm (uPVC) 3.9km. Laying and jointing of pipes including installation of fittings such as valves and fire hydrants. Hydraulic testing and disinfection of the all reticulation and bulk mains. Replacement and/or rehabilitation of pavement, kerbing, walls, fences and driveways removed during excavation works. Installation of water meters for households and house connections for all 580 households. Decommission of existing AC water pipelines. Commissioning and handover.
Project at a glance
Tlhabane AC Water Pipes - Phase 2B is located in Rustenburg. The project is classified in the Public sector. Its current recorded stage is Underway. The recorded project value is R 61 Million - R 200 Million.