Project overview
About this development
Construction of a 500 megawatt gas to power plant in the event of a commercial gas discovery from Muzarabani in Zimbabwe. The gas to power plant will be built in two phases with the first phase estimated at ±150MW and the second phase consisting of an additional ±350MW. The optimal location of the plant will be determined by factors including proposed pipeline routings and access to transmission infrastructure including the Southern Africa Power Pool (SAPP). Estimated project cost: US$ 800 million. The exact co-ordinates are currently not available however the approximate area of location is lat: -16.0893164; long: 30.69762979999999.
Project at a glance
Tatanga Energy Gas to Power Plant, Zimbabwe is located in Zimbabwe. The project is classified in the Private sector. Its current recorded stage is Procedural. The recorded project value is R 200 Million+.