Project overview
About this development
Construction of package 6, sub-package 6 as part of the Palmiet System Infrastructure development in Germiston, Gauteng. The contract value is R1 413 172 528.48. The O6 pipeline phase 2 is approximated to be 10.0 km length from Signal Hill to Lombardy (Sandton Meter take- off). The scope of work will include investigation, land acquisition, design, excavation, pipe-laying, backfilling, commissioning and put into use. The pipeline to end off just after Van Riebeeck Avenue road with a pipe jack with and cross-connection to the H2 pipeline. The exact GPS Coordinates are 26°11'10.4"S 28°08'53.8"E.
Project at a glance
Palmiet System, Package 6: Sub-Package 2 is located in Germiston. The project is classified in the Public sector. Its current recorded stage is Awarded. The recorded project value is R 200 Million+.