Project overview
About this development
Upgrading of the Olifantspoort and Ebenezer water schemes near Polokwane, Limpopo. CIDB 9CE The scope of work includes the construction of a new 10.8km long 900mm ND steel duplicate rising main from the Ebenezer WTW high-lift pump station to the Rustfontein reservoir complex. The new pipeline will run parallel to the existing 600mm ND steel pipeline with the two deviations. Construction of a 2.5km long section of 600mm ND steel pipeline. The new pipeline section will start at the tie-in to the existing the pipeline B outside chamber GB73, where it currently joins with the pipeline A. The new pipeline will run parallel to the existing pipeline A along a gravel road, crossing a tarred road before terminating at a connection to the existing pipeline A at the off-take to the Mankweng reservoir. Construction of a duplicate gravity main from the Specon reservoirs to the pump station 2 in the Olifantspoort scheme. The GPS marker has been placed at the Olifantspoort WTW 24°21'16.5"S 29°45'33.9"E
Project at a glance
Olifantspoort & Ebenezer WS is located in Polokwane (Pietersburg). The project is classified in the Public sector. Its current recorded stage is Tender. The recorded project value is R 200 Million+.