Project overview
About this development
Construction of the Namanga Water and Sanitation Project, Lot 1 in Namanga Town, Kenya. Project cost has not been disclosed. Scope of works could include: 3000m³/day full wastewater treatment plant complete with inlet works, waste stabilization ponds and associated works. Overflow/ outfall sewer, sludge drying beds, site works and access roads. Construction of a utility building and staff houses. Trunk and primary sewer lines, 8.1km, 500mm diameter HDPE sewer line, 1km 400mm diameter HDPE sewer line, 10.9km 300mm diameter HDPE sewer line, 1.417km 250mm diameter hdpe sewer line. 30km laterals and 500 consumer connections. 7 ablution blocks (including provision of 2 exhausters and 1 flashing units). Rehabilitation of Namanga Water Supply: rehabilitation of the existing spring intake at Namanga Hill and construction of a 9.5km rising main from spring intake to Dubai tank; construction of a 250m³ reinforced concrete tank. Construction of 100m³ 20m high elevated tank, 200 new consumer connections. Construction of 12km distribution mains, drilling and equipping with solar. 7 new boreholes (2 at Namanga Town, 1 at Kikelea, 1 at Ormankeki, 1 at Ngatataek, 1 for Eluanata and 1 at Bisil Town. At each borehole, there will be a 24m³ tank for storage. Construction of 4 water kiosks in Namanga Town equipped with a 10m³elevated tank. Equipping and solarization of the 2 existing boreholes at Namanga Town. The exact GPS location is not known and the Marker has been placed at the Namanga Township Primary School, 2°32'23.2"S 36°46'47.8"E
Project at a glance
Namanga Water and Sanitation, Lot 1 is located in Kenya. The project is classified in the Public sector. Its current recorded stage is Procedural.