The Mmamantswe Coal Project tenement area is positioned between the major infrastructure corridor of Botswana and the South African border. The project includes a 1000 MW power station, fed by four-million tons of washed coal a year. The project has a measured and indicated resource estaimted of 1.24 billion tonnes of thermal coal. Rail, power and highway links to Gaborone and South Africa pass within 30 km of the coal deposit. The Mmamantswe Coal Project is located 70km North of the capital, Gaborone, in Botswana. Estimated total capital cost of $350 million on an owner-operated basis. The exact co-ordinates are currently not available however the approximate area of location is lat: -24.2453887; long: 26.5659132.
Project at a glance
Mmamantswe Integrated Coal Project, Botswana is located in Botswana. The project is classified in the Private sector. Its current recorded stage is L2B Shelved. The recorded project value is R 200 Million+.