Project overview
About this development
Construction of a photovoltaic solar facility with a contracted capacity of up to 75MW located on Portion 3 of the Farm McTaggarts Camp 453 and Portion 12 of the Farm Klip Punt 452 within the Kai !Garib Local Municipality of the greater ZF Mgcawu District Municipality, Northern Cape Province. The development footprint will be approximately 190ha and will include in the scope of works will be the following infrastructure: Solar PV panels; centralised inverter stations or string inverters; cabling between the panels, to be laid underground where practical; an on-site facility substation to facilitate the connection between the solar PV facility to the electricity grid; an access road to the development area with a maximum width of 6m; internal access roads within the PV panel array area with a maximum width of 5m; a temporary laydown area and operation and maintenance buildings including a gatehouse and security building, control centre, offices, warehouses, a workshop, and visitors centre. The exact co-ordinates are currently not available however the approximate area of location is 28°42'31.0"S 20°58'33.5"E.
Project at a glance
McTaggarts PV1 Solar Facility is located in Keimoes. The project is classified in the Private sector. Its current recorded stage is L2B Shelved.