Project overview
About this development
Construction of a manufacturing facility in Zone 1A of the Industrial Development Zone Soc Ltd, East London, Eastern Cape. The scope of the works includes the construction of a manufacturing facility comprising a steel structure clad in aluminium roof and side sheeting, concrete raft floor slab and part mezzanine slab, electrical installation, access control, air conditioning and ventilation installation, fire protection (sprinkler system installation, fire hose reels and internal hydrants) and hot water generation installation. Attached on each of the manufacturing facilities, office blocks comprising reinforced concrete structure/raft slab with brick infill walls clad in aluminium roof sheeting, with suspended ceilings, carpets /porcelain tile floor finish, electrical installation, access control, air conditioning and ventilation installation, fire protection (sprinkler system installation, fire hose reels and internal hydrants) and hot water generation installation. External works comprising water stormwater and sewer including manholes, roadways (concrete hardstand, pedestrian paving and kerbing), retaining walls, armco barriers, gate house, entrance gate, landscaping and fencing. CIDB 9GB
Project at a glance
Manufacturing Facility 4 in Zone 1A of the ELIDZ - GE1 is located in KuGompo City (East London). The project is classified in the Public sector. Its current recorded stage is Complete. The recorded project value is R 200 Million+.