Project overview
About this development
Construction of the proposed 300MW coal thermal power plant at Lubhuku in Eswatini. Estimated cost: E12 billion. The thermal plant will be composed of a single boiler and a single steam turbine generator with an air cooled condenser. The boiler will be a Circulating Fluidised Bed (CFB) boiler and it will be fed with coal sourced from Mpaka 3 mine, which will be combusted to produce the heat. This heat will be used to convert water in the boiler into steam which will be used to drive a turbine housed in turbine-generator building. The turbine generator will produce electricity and the turbine generator building will also house the control room. The type of coal to be used in the project is bituminous coal. The exact co-ordinates are currently not available however the approximate area of location is lat: -26.412; long: 31.78.
Project at a glance
Lubhuku Coal Thermal Power Plant, Eswatini is located in Eswatini (Swaziland). The project is classified in the Public Private Partnership sector. Its current recorded stage is Procedural. The recorded project value is R 200 Million+.