Project overview
About this development
Expansion works for Huguenot Tunnel north and south bore carriageway located N1 freeway, Section 1 about 60km from Cape Town, through the Du Toitskloof mountains, Cape Winelands District Municipality, Western Cape. CIDB 9CE. The scope of works on the north bore will include concrete lining; continually reinforced two-lane pavement with associated drainage and services; electrical, ventilation and fire-fighting systems and upgrades to the highway on either side of the north bore including the design of the new Elands River Bridge and widening of the existing Molenaars River Bridge to accommodate the two additional lanes to the north bore. Upgrade works to the south bore, which are dependent on the status of a current rehabilitation contract, are envisaged to address moisture ingress and structural integrity, as well as rehabilitation of fire-damaged areas. In addition there could be construction of two ventilation buildings and two operations buildings with associated backup facilities. The GPS coordinates are 33°43'57.8"S 19°05'35.0"E.
Project at a glance
Huguenot Tunnel Expansion is located in Paarl. The project is classified in the Commercialised State sector. Its current recorded stage is Tender. The recorded project value is R 200 Million+.