Project overview
About this development
Construction of the Cornubia Boulevard located in Cornubia near Mount Edgecombe, KwaZulu-Natal. CIDB 9CE. The project entails work package 6A as part of the GO!Durban C9 Corridor and entails the construction of roads, sidewalks, stormwater drainage systems, foul water systems, watermains, ducts, landscaping, street lighting, ancillary works and all road works items. Package 6A is along Cornubia Boulevard from the proposed Dube West-Cornubia Boulevard intersection to the proposed Dube East-Cornubia Boulevard intersection The exact GPS coordinates are not known and the GPS has been placed on the estimated route of construction 29°43'49.7"S 31°02'20.8"E
Project at a glance
GO!Durban C9 Corridor: Work Package 6A - Cornubia Boulevard is located in Durban. The project is classified in the Public sector. Its current recorded stage is Postponed. The recorded project value is R 200 Million+.