Construction of Gluckstadt stand alone water supply scheme: Phase 1 in Vryheid, KwaZulu-Natal. The proeject value is R40 669 105. The scope of work comprises the construction of approximately 4 750m rising main (2 500m 110mm class 16 uPvc and 2 250m 100mm PN30 MS) 30km reticulation (32 class 10 to 200 class 9) network with 241-yard taps, two reinforced concrete reservoirs (200kl and 750M) and one 50kl elevated tank with associated valves chambers and fittings. The exact GPS location is not known and the Marker has been placed at the site inspection site: 27°58'32.6"S 31°01'56.3"E
Project at a glance
Gluckstadt WSS: Phase 1 is located in Vryheid. The project is classified in the Public sector. Its current recorded stage is L2B Shelved. The recorded project value is R 31 Million - R 60 Million.