Project overview
About this development
Construction of civils and infrastructure for the development of a hotel (5 200m²), conference centre (750m²), gym (2 928m²), lobby (550m²), spa (350m²), bar (222m²), apartments (2 850m²), circulation (698m²), foyer (967m²) and 534 parking bays on Erf 1339, Pieterburg extension 4 on the farm Sterkloop 688LS between Johnson Street and Grobler Street along Oost Street in Polokwane within Polokwane Local Municipality of Capricorn District. There will be a pedestrian bridge over Grobler Street connecting the two developments on erf 1339 and 1340. The geographical coordinates for the proposed site: 23°54’18.7”S and 29°28’13.3”E
Project at a glance
Erf 1339 Pietersburg - Infrastructure is located in Polokwane (Pietersburg). The project is classified in the Private sector. Its current recorded stage is Cancelled. The recorded project value is R 0 Million - R 30 Million.