Project overview
About this development
Construction of the Duvha Transmission Power System Control and Monitoring (TPSCM) Data Centre Building at Duvha Power Station, located on the old Bethal Road, Emalahleni Local Municipality, Mpumalanga. CIDB 7GB (Only applicable for Part A) and 5 EB/EP (Only applicable for Part B). Part A: Duvha Transmission Power System Control and Monitoring (TPSCM) Data Centre Building. Building, infrastructure, fencing and security together with the Non-lethal Energized Perimeter Detection System (NLEPDS); Part B: Design, supply, install, test and commission the backup power system for the TPSCM Duvha SOC Building. Part C: Design, manufacture, supply, develop user documentation, perform testing at works. Deliver, install and commission the integrated physical security system and associated equipment at the Duvha TPSCM facility. The location of the power station is 25°57'39.2"S 29°20'20.3"E
Project at a glance
Duvha Data & Energy Centre is located in eMalahleni (Witbank). The project is classified in the Commercialised State sector. Its current recorded stage is Underway. The recorded project value is R 31 Million - R 60 Million.