Project overview
About this development
Construction of Waterfall's new N1 highway overpass bridge situated south of the Allandale interchange and north of the Buccleuch interchange in Gauteng. The overpass will create a direct link between Midrand and Waterfall City, opening up an important route that will make traveling easier and faster. The superstructure of the bridge will total a length of 115.8 metres and carry four lanes of traffic - two in each direction - a pedestrian walkway, a cycle track and a raised centre median resulting in a width of 22.7 metres. The estimated value of the entire project is R160 Million.
Project at a glance
Bridal Veil Road Overpass Bridge is located in Midrand. The project is classified in the Private sector. Its current recorded stage is Complete. The recorded project value is R 200 Million+.