Construction of a renewable energy generation facility with associated infrastructure and structures for a 100MW Photovoltaic Solar Park on Portion 1 and Remainder of the farm Piedmont 419 LT and Boschrand 399 LT, located within the Greater Letaba Local Municipality, Mopane District, Limpopo Province. A power line will be developed to connect the PV solar park with the existing Eskom powerline which is connected to the Mooketsi Main Transmission Substation. The PV plant will mainly consist of the following components: photovoltaic cells and photovoltaic modules, support structures, strings and string boxes. The GPS coordinates are 23°37'40.4"S 30°07'35.4"E
Project at a glance
Beretta Solar PV is located in Mooketsi. The project is classified in the Private sector. Its current recorded stage is Procedural. The recorded project value is R 200 Million+.