Project overview
About this development
Refurbishment of a 40ML reservoir at Point D and associated works located in the Emalahleni Local Municipality, Mpumalanga. CIDB 7CE. The scope of works involves but not limited to the following: repairs of structural cracks on the reservoir, replacement of all associated reservoir isolating valves, replacement of all scour valves, repair and install new concrete palisade fence at pumpstation, repair concrete palisade fence around the entire Point D site, repair steel palisade fence around the generators, refurbish pipeline at the backwash pumpstation, replacement of the 5 existing pumps inside the main pump station, replacement of pipe specials and valves of the reservoirs, water towers and pumpstations. The GPS marker has been placed at the Emalahleni Water Purification Plant 25°52'49.8"S 29°14'03.9"E.
Project at a glance
40Ml Reservoir, Point D is located in eMalahleni (Witbank). The project is classified in the Public sector. Its current recorded stage is Underway. The recorded project value is R 31 Million - R 60 Million.