Muheza - Amani Road, Tanzania
49
  • 37200
Upgrading of the Muheza - Amani Road from km 14.350 to km 17.350 in Muheza, Tanzania. Project value is TZS 6,596,178,050 (R41 021 387,23). Scope of works could include: upgrading road to double bituminous surface dressing standard, phase III. The GPS marker has been placed along the proposed scope of


Projects

P33/2 Cellular Bridge
87
  • 38044
Construction of a cellular bridge on Primary Road P33/2 (R59) Saltpan and the maintenance of adjacent access roads at Viljoenskroon in Fezile Dabi, Free State. CIDB 8CE. The GPS marker has been placed at Saltpan 27°12'53.3"S 26°54'14.0"E


Projects

Upgrading of Road D514, Z561, D503 and D501
118
  • 28558
Upgrading from gravel to surface standard of road D514, Z561, D503 and D501 from access to Ramokastad to Mmoaronong via Pylkop access approximately 21km (including 2 water crossing bridges), in Bojanala Platinum District Municipality, North West. The contract value is R209 805 060.04. The The exact GPS


Projects

N3 Upgrade: Gladys Manzi to New England
404
  • 15867
Upgrade of National Route 3, Section 3 Gladys Manzi Road bridge from km 5.9 to New England Road Interchange at km 9.0, uMsunduzi Local Municipality, uMgungundlovu District Municipality, KwaZulu-Natal. Value: R1 913 506 115.55. The GPS co-ordinates are 29°38'22.8"S 30°25'09.9"E


Projects

Road D433 From N18 to Madiba a Ga Kubu
3
  • 36921
Upgrading from gravel to surface standard of road D433 from N18 to Madiba a Ga Kubu through to Tsunyane for 17.5km, road Z491 from intersection with road D433 in Tshunyane to Z454 for 9.65km and rehabilitation of road D433 in Ngaka Modiri Molema District Municipality, North West. The GPS marker has


Projects

Road P47/3 Maintenance
9
  • 32210
Special maintenance on road P47/3 from Swartruggens to P34/2 including intersection improvement for approximately 36km in the North West. The exact GPS co-ordinates are currently not available, however the GPS marker has been placed at the Swartruggens, until the exact site location is confirmed -25.6504154,


Projects

Lwamondo Access Road
116
  • 34285
Construction and upgrading of Lwamondo Territorial Council access road, Thohoyandou, Limpopo. Value of the project: R96 930 076,81. The scope comprises the construction of a 6.0km road and stormwater control system. The area is located approximately 4km from the intersection of national road R542 and


Projects

Donkerhoek TCC
121
  • 38014
Special maintenance of the Donkerhoek Traffic Control Centre on National Route N4 section 1 in Pretoria, Gauteng. CIDB 7CE. GPS coordinates are 25°46'10.7"S 28°24'32.0"E


Projects

N12 Sec 17
138
  • 31248
Resurfacing of National Route N12 section 17 from Potchefstroom at km 4.38 to km 57.46, Dr Kenneth Kaunda and West Rand District Municipalities, in the provinces of Gauteng and North West. The GPS is not known and the Marker has been placed along the N12 at the NW / GP border 26°36'09.5"S 27°14'01.5"E


Projects

Voortrekker Road
119
  • 36195
The upgrading of Voortrekker Road, from 4th Avenue to 12th Avenue, located in Maitland, Cape Town, Western Cape. Contract value of R174 350 000,00. The GPS marker has been placed along the proposed construction route 33°55'08.6"S 18°30'33.6"E