Construction of Centocow bridge (No. 3520) on local road L3366 at km 2.02 over Umzimkhulu rivers, on the P422, to Centocow, Umzimkhulu, Kwazulu-Natal. Value of R101 338 193.28. The scope of works include: establishment on site, foundation excavations, construction of reinforced concrete foundations,
Construction of bridges and roadworks as part of work package 2 for the Fannin Road upgrades in Ward 9, Molweni, KwaZulu-Natal. CIDB 8CE. Work Package 2 is for the construction of the following: Construction of Fannin Road from Ch.1330 to 2000. The road will be constructed to a 5.5m width, with Figure
Upgrade of National Route 3, Section 3 Gladys Manzi Road bridge from km 5.9 to New England Road Interchange at km 9.0, uMsunduzi Local Municipality, uMgungundlovu District Municipality, KwaZulu-Natal. Value: R1 913 506 115.55. The GPS co-ordinates are 29°38'22.8"S 30°25'09.9"E
Maintenance of National Route R62 Section 6 between the Western Cape and Eastern Cape border and Louterwater from km 36.75 to km 58.60, Kou-Kamma Local Municipality, Eastern Cape. Value of the project: R259 900 000.00. The approximate GPS location has been placed along the proposed area of construction
Improvement of pedestrian facilities on National Route 5 Section 3 from km 34.0 to Paul Roux at km 37.0, Dihlabeng Local Municipality, Free State. Project Value: R196 294 437.65. Estimated GPS coordinates on the N5 are 28°18'22.5"S 27°56'27.0"E
Emergency repairs of the R61 section 7 at km 43.6 at the Cicira River Bridge B4117 and culvert C0246 (Efeta) near Mthatha, Eastern Cape. CIDB 7CE. The GPS marker has been placed at the Cicira River Bridge, 31°34'10.2"S 28°42'53.3"E.
Construction of a new, modern border post and accompanying road network connecting Zambia and the Democratic Republic of the Congo (DRC) under a Public-Private Partnership (PPP) arrangement. The Kimiswalo Border and Road Project is located in the Kyafukuma area of Solwezi District within the north-western
Construction of section 2 of the proposed Lagos-Calabar Coastal Highway in Nigeria. Project cost estimated at N1.334 trillion. Scope of works: construction of a modern road spanning approximately 700km. It will connect Lagos, Nigeria's economic hub, to Calabar, a major coastal city. The road project
Upgrading of the Muheza - Amani Road from km 14.350 to km 17.350 in Muheza, Tanzania. The value of the project has not been disclosed. Scope of works could include: upgrading road to double bituminous surface dressing standard, phase III. The GPS marker has been placed along the proposed scope of work
The Modjo-Hawassa Highway Project in Ethiopia. This is for Phase II: Zeway - Hawassa section, Lots 2 & 3 : Arsi Negele - Hawassa and Batu (Zeway) Arsi Negele Section of the road. The works will comprise the construction of the main line freeway from Arsi Negele to Hawassa, approximately 55.24kms in