Construction of a mega-bridge called Msikaba Bridge with the main span of 580m supported from a pair of 127m-tall pylons. The deck will be 194m meters above the valley floor, located within Lusikisiki in the Eastern Cape as part of the N2 Wild Coast Toll Road. The total contract amount is approximately
Construction of the N2 Section 20 between the Msikaba Bridge and the Mtentu Bridge on the Wild Coast Toll Highway located in Eastern Cape. The project value is R 2 545 887 374,99. The exact GPS co-ordinates are currently not available however the marker has been placed as the Msikaba Bridge 31°17'20.5"S
Construction of bridges and roadworks as part of work package 2 for the Fannin Road upgrades in Ward 9, Molweni, KwaZulu-Natal. CIDB 8CE. The GPS marker has been placed on Fannin Road 29°45'24.3"S 30°52'39.9"E
Construction of a mega bridge called Mtentu in total length of approximately 1 130m and comprises a main span of 260m constructed as a balanced cantilever with main piers approximately 160m high, plus approach viaducts constructed using incremental launching methods located in the Eastern Cape as part
Special maintenance of the National Route 1 Section 1 from Market Street at km 55.15 to the Huguenot Tunnel at km 61.59 located near Paarl, Western Cape, CIDB 8CE. The GPS marker has been placed along the route of construction 33°44'43.8"S 19°03'32.1"E
Upgrading of the R72 Section 4 and MR501 Intersection at km 42.08 in Kidds Beach, near East London, Eastern Cape. The project value is R 75 860 000,00. The exact GPS location is not known and the marker has been placed at R72 intersection towards Kidds Beach 33°08'12.0"S 27°40'44.2"E
Construction of secondary roads at the Waterfall Cemetary, located in Waterfall City, Midrand, Gauteng. The exact GPS co-ordinates are 6°02'26.6"S 28°08'13.1"E.
Upgrading to bitumen standard of the Galana – Kulalu Approach Roads. Located in Malindi and Magarini Constituencies, Kilifi County, Kenya. Estimated Project Cost: Approximately Ksh 450 Million - Ksh 650 Million. Scope of Works include: Removal of obstructions and topsoil stripping. Filling and compaction
Upgrade of MDC Section 7A from Montrose interchange to west of Alkmaar intersection N4-7 from km 23.07 to km 32.72 in Mpumalanga. CIDB 9CE/SB. The road is divided into two typical existing road sections: Section 1: km 23.09, north of Montrose Interchange to km 31.3 undivided 4-lane road with narrow surfaced
Resurfacing on National Route R40 Section 6 from Hoedspruit at km 0.0 to R526 Intersection at km 32.02 in the Limpopo Province. CIDB 9CE. The GPS marker has been placed at the R40 / R526 intersection 24°20'56.1"S 30°57'15.1"E