Construction of the Nebbi-Arua Road measuring 80kms in Nebbi Northern Uganda. Scope of works could include: construction of a high standard bituminous surfaced road to replace the existing gravel road. The exact GPS location is not known and the Marker has been placed at 2.4814613, 31.0907238.
Construction and upgrading of Shabani, Mukendo, and Musoma Bus-Saa Nane Roads as well as the construction of Bweri Bus Stand and Nyasho Modern Market in Musoma, Tanzania. Project scope includes: Roads = 3.36 Km. Bus Terminal = 27,050.5 M2. Modern Market = 5,031 M2. The exact GPS location is not known
Upgrading of 95km of the Kumi-Ngora-Serere-Kagwara road, including the construction of 13km of selected town and access roads in Uganda. Scope of works: Upgrading to bituminous standard. The exact GPS location is not known and the Marker has been placed along the Kumi - Ngora road, 1.4847826, 33.9156201
Construction of a F1 Racetrack in Cape Town, in the Western Cape. The proposed venue is the Green Point Sport Precinct. The GPS co-ordinates are 33°54'16.4"S 18°24'24.6"E.
Construction of pedestrian facilities on National Route 2, Section 22 from Mthusi at km 0,80 to Murchison at km 18,64 in Port Shepstone, KwaZulu-Natal. Value of R145 098 044.38. The GPS coordinates are: -30.727190498452423, 30.354470501243757
Routine road maintenance of National Route 1 Sections 4 to 7 from Constable at km 21.68 to Remhoogte at km 8.27 in the District Municipality of Central Karoo, Western Cape. Value: R76 943 920.75. The GPS marker has been placed along the route of construction: -33.1079885, 21.3979647
Construction of earthworks, layerworks and road finishes on Main Road P130, from km 15.00 to km 18.00 near Impendle in KwaZulu-Natal. Value of R97 546 004.28. The exact co-ordinates are currently not available however the approximate area of location is 29°35'58.9"S 29°52'01.4"E
Construction and upgrading works for the Wajir - Tarbaj (A13) road and Tarbaj Spur road (57km), axle load control station and civil works associated with installing a Fibre Optic cable along Samatar-Wajir-Tarbaj road section (124km) in Kenya. The GPS marker has been placed in the CBD of Wajir, the coordinates
Construction of the Trans-Gambia Corridor Project, Phase 2 in Gambia. The main elements of the Trans-Gambia Corridor Project consist of: design and supervision of Trans-Gambia Bridge and tolling facilities, design and supervision of 2 No. joint border posts, design and supervision of feeder roads and
Construction and rehabilitation of Woodford access road to blacktop in Ward 12 of the Okhahlamba Municipality, KwaZulu-Natal. CIDB 7CE. The total road length is 2.101km with Road 1 being approximately 1.261km and Road 2 approximately 0.84km. Road 1 is a new track, and Road 2 is an existing deteriorated