Upgrading of the following roads in Tanzania : Burundi: Nyakanazi - Kasulu - Manyovu / Rumonge - Rutunga - Bujumbura (328km). Lot TZ1: Nyankanazi - Kasulu - Manyovu, 250 km (Tanzania); and Lot BU1: Rumonge - Rutunga - Bujumbura, 78 km (Burundi)
Reconstruction and upgrading of Garsfontein road (K50) between Loristo and Anton van Wouw streets including a section of Solomon Mahlangu drive between K50 and Golda/Delfi road - approximately 4.5km in Pretoria Gauteng. Project value is estimated at R690 million. Works include the widening of Garsfontein
Rehabilitation of the Rea Vaya BRT Section 1B Klipspruit Valley Road Link, Eldorado Park, Johannesburg, Gauteng. The scope of work will include detailed geotechnical investigations into the cause of pavement distress along the route, road works, ie layout drawings and typical cross-sections and all the
Construction of the Chifuma and Musanya bridges located on the Chinsali - Nakonde Road in Muchinga Province, Zambia. The exact GPS coordinates are unknown, and the marker has been placed as the RDA offices in Lusaka -15.419444906032103, 28.307357402141744.
Construction of the Dar es Salaam Bus Rapid Transit, phase 4 in Dar es Salaam, Tanzania. The project involves construction of a Bus Rapid Transit Infrastructure systems, which is comprised of about 30.12km roads. These include (i) A Section Bibi Titi Mohamed Road from Maktaba Street junction to Ohio
Construction works to upgrade approximately 97.87 km of the Lufwanyama to Kankolonkolo (M18) road in Copperbelt and north western province - lot 1, Zambia. The scope of work will include among other things: 1) Upgrading of the existing narrower gravel roads to bituminous surfaced standard; 2) Minor realignments;
Upgrading of the D319 Kalabo – Kalonola – Sitoti – Matebele road to bitumen standard in the western province, Zambia. The exact co-ordinates are currently not available however the approximate area of location is lat: -15.0083731; long: 22.6614993.
Upgrading the existing Busunju- Kiboga-Hoima road from its current status to that of bitumen standard for a total of 145km in Kampala, Uganda. Scope of works could include: Upgrading the road being more or less along the existing alignment in order to minimize fresh disruptions to the environment with
Upgrading of roads and stormwater systems in Ga-Rankuwa Zone 4, Phase 2, Pretoria, Gauteng. The contract value is R37 373 666.88. The project involves the upgrading of residential streets in Garankuwa Zone 4. Extent of the works are as follows: grubbing, mass earthworks for the roads, excavation (soft,
Urgent routine road maintenance on National Road R392 Section 3 from R58 Intersection to DR8560 Intersection for approximately 44.40km, National Road R393 Section 2: Palmietfontein to Telle Bridge Border Post for approximately 3.03km and National Road R726 Section 1 from Palmietforntein to DR8605 Intersection