You are currently logged out and we are unable to show you directory results. Please Log in or Subscribe for ALL the information relating to your search.

Found 4173 items with Total of 4241 results

Advertising



Projects

Nebbi - Arua Road, Uganda
59
  • 34025
Construction of the Nebbi-Arua Road measuring 80kms in Nebbi Northern Uganda. Scope of works could include: construction of a high standard bituminous surfaced road to replace the existing gravel road. The exact GPS location is not known and the Marker has been placed at 2.4814613, 31.0907238.


Projects

Shabani, Mukendo, Musoma Bus - Saa Nane Roads, Tanzania
61
  • 34894
Construction and upgrading of Shabani, Mukendo, and Musoma Bus-Saa Nane Roads as well as the construction of Bweri Bus Stand and Nyasho Modern Market in Musoma, Tanzania. Project scope includes: Roads = 3.36 Km. Bus Terminal = 27,050.5 M2. Modern Market = 5,031 M2. The exact GPS location is not known


Projects

Kumi-Ngora-Serere-Kagwara Road, Uganda
56
  • 35713
Upgrading of 95km of the Kumi-Ngora-Serere-Kagwara road, including the construction of 13km of selected town and access roads in Uganda. Scope of works: Upgrading to bituminous standard. The exact GPS location is not known and the Marker has been placed along the Kumi - Ngora road, 1.4847826, 33.9156201


Projects

Cape Town Formula One Grand Prix Racetrack
280
  • 16011
Construction of a F1 Racetrack in Cape Town, in the Western Cape. The proposed venue is the Green Point Sport Precinct. The GPS co-ordinates are 33°54'16.4"S 18°24'24.6"E.


Projects

N2 Sec 22 Mthusi to Murchison
172
  • 29970
Construction of pedestrian facilities on National Route 2, Section 22 from Mthusi at km 0,80 to Murchison at km 18,64 in Port Shepstone, KwaZulu-Natal. Value of R145 098 044.38. The GPS coordinates are: -30.727190498452423, 30.354470501243757


Projects

National Route 1 sections 4 to 7
122
  • 28648
Routine road maintenance of National Route 1 Sections 4 to 7 from Constable at km 21.68 to Remhoogte at km 8.27 in the District Municipality of Central Karoo, Western Cape. Value: R76 943 920.75. The GPS marker has been placed along the route of construction: -33.1079885, 21.3979647


Projects

Upgrading of Wajir to Tarbaj
74
  • 32587
Construction and upgrading works for the Wajir - Tarbaj (A13) road and Tarbaj Spur road (57km), axle load control station and civil works associated with installing a Fibre Optic cable along Samatar-Wajir-Tarbaj road section (124km) in Kenya. The GPS marker has been placed in the CBD of Wajir, the coordinates


Projects

Trans-Gambia Corridor Project, Gambia
66
  • 24158
Construction of the Trans-Gambia Corridor Project, Phase 2 in Gambia. The main elements of the Trans-Gambia Corridor Project consist of: design and supervision of Trans-Gambia Bridge and tolling facilities, design and supervision of 2 No. joint border posts, design and supervision of feeder roads and


Projects

P130 Upgrade
310
  • 20740
Construction of earthworks, layerworks and road finishes on Main Road P130, from km 15.00 to km 18.00 near Impendle in KwaZulu-Natal. Value of R97 546 004.28. The exact co-ordinates are currently not available however the approximate area of location is 29°35'58.9"S 29°52'01.4"E


Projects

Underberg Roads Maintenance
148
  • 27721
Maintenance of various Roads within the Underberg Zone, in Underberg, KwaZulu-Natal. R95 989 763.79. Approximate GPS co-ordinates 29°47'48.4"S 29°30'02.1"E

Advertising

Send me a Sample Based on these search results