Routine road maintenance of the National Route N4 section 1 & 2, N4 sections 9, 11 & 12 and N1 section 21 & 22 within the City of Ekurhuleni, in the Province of Gauteng. The GPS marker has been placed along the proposed construction route 25°45'32.1"S 28°04'09.6"E
Periodic maintenance of the National Route 10 Section 6 from Hanover at km 0.0 to Dieprivier at km 20.00, local municipality of Emthanjeni, Pixley Ka Seme District Municipality, Northern Cape. The value of the project is R 80 500 000,00. Completion contract: CIDB 8CE. The GPS marker has been placed
Construction of the Kofele - Kore - Bekoji and Arsi Negelle - Bilallo Junction, Ethiopia. Scope of works could include: Design and build contract for an asphalt road of 89.90km in length. The exact GPS location is not known and the Marker has been placed at Kofele 7.0766834, 38.7868342.
The routine road maintenance of the National Route R359 Section 1 from Augrabies Falls at km 0.00 to Alheit at km 26.27, located within the Pixley ka Seme District Municipality, Northern Cape. The GPS marker has been placed along the proposed construction route, 28°42'40.9"S 20°29'29.7"E.
The routine road maintenance of the National Route N1 Sections 11 to 13 from Flaauwe Kop at km 36.78 to Stockenstrom at km 0.17, located within the Pixley ka Seme District Municipality, Northern Cape. The GPS marker has been placed along the proposed construction route, 31°00'05.4"S 24°34'38.2"E.
Construction of the remaining works for the Jihur-Deneba-Lemi Megenteya-Guguftu-Wereilu-Degolo Road including the Guguftu-Wereilu-Degolo Road in Ethiopia. Scope of works could include: Upgrading of the 74.4 Km existing unpaved gravel road to a two-lane road with a 7.00m carriageway width. Asphalt concrete
Periodic maintenance of trunk road 83/1 and 83/2 from Riversdale to Ladismith, in the Western Cape. CIDB 8CE. The exact GPS co-ordinates are currently unavailable, however the GPS marker has been placed on Hessequa Local Municipality Riversdale: 34°05'29.3"S 21°15'32.9"E.
Special maintenance of the Bapong Traffic Control Centre on the National Route N4 Section 12 in the Madibeng Local Municipality and the Bojanala District Council Municipality in the North West. CIDB 8CE. The GPS marker has been placed at the Bapong Traffic Control Centre 25°43'05.0"S 27°41'21.8"E
Routine road maintenance of National Route N14 from Ditsobotla Municipal border to the Gauteng border, R30 from Kgetlengrivier Municipal border through Ventersdorp to Matlosana Municipal border and R53 from Potchefstroom to Ventersdorp in the North West. CIDB 7CE. The GPS coordinates have been placed
Construction of Kuruman N14/R31 bypass road Phase 1A in Kuruman, Northern Cape. Value of R41 454 413.06. Scope of works could include overhaul, clearing and grubbing, excavation for open drains, prefabricated culverts, concrete kerbing, concrete, channelling, chutes and downpipes, and concrete linings