Construction and upgrading of Mapate access road, Thulamela Local Municipality, Thohoyandou, Limpopo. Value of the project: R109 811 936.00 . Scope of work: The primary objective of the project is to upgrade the access road between Tshisahulu and Mapate from gravel to surfaced standards. The total project
Construction of road from Mokwete to Molepane Phase 2, Jane Furse, Limpopo. CIDB 7CE. The exact GPS location is not known and the Marker has been placed on route 24°48'02.8"S 29°52'57.9"E
Improvements of National Route R63 sections 15 and 16 from Bhisho at km 5.8 to the N6 Bridge Intersection at km 1.0, Eastern Cape. The project value is R 1 347 079 099,00. Scope of works: Upgrading of the existing two-lane single carriageway to a dual carriageway from km 5.9 to km 9.6 (approximately
Phase 2 of the upgrading of road DR08303, DR08329, DR08308 and DR08309 from R61 at St Barnabas Hospital to Hluleka Nature Reserve (32km) near Libode, Eastern Cape. The project value is R546 677 296.80. Completion contract value R705 553 750.00. The exact co-ordinates are currently not available however
Construction of the bus road and stormwater control, Phase 1 in Waalkral Village, in Elias Motsoaledi Local Municipality, Limpopo. R62 107 872,00. The project scope entails widening of the road to 6m for approximately 7km, 30mm asphalt layer, concrete line v-drains, concrete kerbs, two portal culvert
Resurfacing of National Road R81 Section 1 from km 37.00 to km 61.19 and from km 71.12 to km 75.40 in Limpopo. CIDB 9CE. Scope of works: Milling and replacement of the existing asphalt surfacing, localized pavement rehabilitation and repairs, crack sealing, patching, asphalt overlays, road marking reinstatement,
Construction of the Ndlunkulu bridge and associated roads located in Ngcobo, Eastern Cape. CIDB 7CE. The GPS coordinates are not known and the marker has been placed at the location of the site meeting 31°40'28.8"S 27°59'44.4"E
Upgrading of the Simbo - Ilagala - Kalya road to bitumen standards for 234km in Tanzania. The value of the project is not known. The exact GPS coordinates are not known and the marker has been placed at the Tanzania National Roads Agency office 6°48'42.3"S 39°17'33.5"E
Upgrading of Tshino access road for a distance of 5,514km, located in Makhado Municipality, Limpopo. Value of the project: R69 662 844,32. The scope of work includes earthworks or excavation for the road layers. Construction of In-Situ roadbed layer. Construction of the sub-base layer using borrow pit
Routine road maintenance of National Route 8 Section 6 between Groblershoop (km 0.00) and Rooisand (km 8.18), and National Route 10 Sections 8 to 11 between Omdraai (km 61.64) and Boegoeberg (km 59.44), located within the local municipalities of Siyathemba and !Kheis, and district municipalities of both