Construction of a bus route for the Motala Farm Housing Project in Hambanathi, KwaZulu-Natal. Value: R59 576 746.33. GPS location is not available, approximate co-ordinates are 29°33'10.9"S 31°07'24.0"E
Construction of the IRT Phase 2A Claremont bus facility and associated infrastructure, located in Cape Town, Western Cape. The project value is R 246 539 614,00. The GPS co-ordinates are 33°58'49.5"S 18°27'59.6"E.
Upgrade of District Road D1925 from gravel to blacktop, in Bhadeni, on the outskirts of eDumbe town, KwaZulu-Natal. CIDB 8CE. The GPS marker has been placed on the D1925 27°25'54.5"S 31°02'04.9"E
Routine and safety maintenance on main road P98 from km 0.000 to km 20.850 and P521 from km 0.00 to km 7.640 in the Ethekwini Metro, Durban Region, KwaZulu-Natal. Value of R36 268 047.21 . The GPS marker has been placed along the route of construction 29°36'48.5"S 31°00'46.0"E
Routine road maintenance of N2 section 21X from km 0.00 to N2 section 22X at km 29.60 and N2 section 22 from km 0.00 to N2 section 23 at km 44.78, near Port Shepstone, KwaZulu-Natal. Contract value: R156 155 895,25. The exact co-ordinates are currently not available however the approximate area of location
Construction of the IRTPN line 2B (Lynnwood and Atterbury Road) which consists of the widening of three main intersections and associated works in Menlo Park, Pretoria, Gauteng. R145 680 706.98. The GPS co-ordinates are, 25°45'44.4"S 28°15'19.9"E
Construction and maintenance of a new 2.4km section of National Road R573 section 1 from Stormvoel Road at km 0.0 to Baviaanspoort Road at km 2.4 in Niemand Park, Pretoria, Gauteng. CIDB 9CE. The GPS Coordinates have been placed at Stormvoel Road 25°42'57.4"S 28°17'45.1"E.
Upgrading of the following roads in Tanzania : Burundi: Nyakanazi - Kasulu - Manyovu / Rumonge - Rutunga - Bujumbura (328km). Lot TZ1: Nyankanazi - Kasulu - Manyovu, 250 km (Tanzania); and Lot BU1: Rumonge - Rutunga - Bujumbura, 78 km (Burundi)
Construction of the Bunso - Adawso Road in Ghana. Construction of the Adawso - Ekyi Aman from Bridge (approximately 3km long) and the road between Adawso and Bunso on the N6 (approximately 128km). The contract value is €113 5490 000. The GPS marker has been temporarily placed in Adawso, the coordinates
Improvement including the addition of shoulders and passing lanes of National Route 7 Section 3 between Piketberg from km 31.53 and Piekenierskloof Pass at km 65.30 in the Western Cape. The project value is R 970 700 000,00. The GPS marker has been placed along the proposed construction route 32°52'14.9"S