Construction of the new Moyeni Police Station in Moyeni, Eastern Cape Province. The contract value is R 74 325 917,05. The GPS co-ordinates are 32°15'19.8"S 27°39'29.4"E.
Construction of the new Ntamonde Police Station on Portion 13 of the farm Ntshangase No. 63 SG, in the Eastern Cape Province. A Marker has been placed at 32°14'17.3"S 28°50'33.6"E
Construction of the N2 Section 20 between the Msikaba Bridge and the Mtentu Bridge on the Wild Coast Toll Highway located in Eastern Cape. The project value is R 2 545 887 374,99. The exact GPS co-ordinates are currently not available however the marker has been placed as the Msikaba Bridge 31°17'20.5"S
Periodic maintenance on National Route 2 Section 9 between the Stormsriver Village I/S at km 22.5 and Witelsbos at km 37.0 in the Local Municipality of Kou-Kamma within the Sarah Baartman District Municipality, Eastern Cape. CIDB 8CE. The exact GPS location is not known and the marker has been placed
Construction of the new Huku Police Station on Portion 7 of the farm Mndileni No. 88 SG, in the Eastern Cape. The project value is approximately R 90 000 000,00. The exact co-ordinates are currently not available however the approximate area of location is Mandileni. 30°43'49.7"S 28°50'26.7"E.
Upgrades, additions and routine road maintenance of National Route N2 Section 8 at km 80.08 and Section 10 at km 73.50 and National Route R62 Section 6 at km 36.76 to Section 8 at km 33.55, Garden Route and Sarah Baartman District Municipalities, Western Cape & Eastern Cape. The GPS Marker has been placed
Construction of the N2 Section 9 between Bloukrans River at km 0.0 and Storms River Village I/S at km 22.5 in the Kou-Kamma Local Municipality, Sarah Baartman District Municipality, Eastern Cape. CIDB 8CE . The exact GPS location is not known and the Marker has been placed near the Tsitsikamma Village
Upgrading of the R72 Section 4 and MR501 Intersection at km 42.08 in Kidds Beach, near East London, Eastern Cape. The project value is R 75 860 000,00. The exact GPS location is not known and the marker has been placed at R72 intersection towards Kidds Beach 33°08'12.0"S 27°40'44.2"E.
Upgrades and additions to the existing Alice Water Treatment Works situated within Alice in Eastern Cape. The scope of works includes the following: raw water inlet and flocculent dosing and mixing systems; sedimentation basins and autonomous gravity sand filters; chlorine dosing systems and sludge ponds
Upgrading of Road DR08598 between Elitheni Coal Mine (13.4km) and Road R56. The existing gravel road, which is approximately 13.4 kilometres long, is to be upgraded to a bituminous surfaced width applicable varying from 8.6m to 9.2m. There is one major structure on the project. The road pavement includes