Construction of a 10MW solar photo-voltaic in Secunda, Mpumalanga. The exact co-ordinates are currently not available however the approximate area of Sasol in Secunda is -26.5298038, 29.1745445
Decommission and replacement of the existing Tutuka Power Station Hydrogen Generating Plant in Thuthukani, Standerton, Mpumalanga. CIDB 7EB. Scope of works: The power station requires the following to be met: Provide the power supply required for the new plant, investigate the location of the current
Construction of improvements and renovations on National Route N2 Section 34 from Piet Retief at km 0 to Verzameling at km 30, in Mpumalanga. CIDB 9CE. The marker has been placed between Piet retief and Verzameling 26°57'12.7"S 30°46'47.4"E
Construction of bulk water and sewer infrastructure in Kinross Extension 33 settlement under Govan Mbeki Local Municipality, Gert Sibande District, Mpumalanga Province. CIDB 7CE. The scope of work could include: site clearance, backfilling of trenches and testing of installation and construction of
Exxaro proposes to relocate the Matla Coal Mine 1 surface infrastructure and access shaft from the farm Haasfontein 85 IS Portion 5 to the remaining extent of the Farm Bakenlaagte 84 IS, Mpumalanga Province. The shaft area with associated infrastructure including the pollution control structures will
The Eloff project is situated adjacent to the Kangala Colliery in Mpumalanga. This allows Universal the opportunity to consolidate the contiguous resource base of the Eloff Project with Universal’s existing Kangala Colliery, and provides optionality for extending Kangala’s life of mine and upsizing the
Resurfacing of National Route N11 Section 6 from Amersfoort at km 0.0 to Vaal River at km 27.6, Dr Pixley ka Isaka Seme Local Municipality, Gert Sibande District Municipality in Mpumalanga. The exact GPS location is not known, the GPS marker has been placed along the N11 in Amersfoort 26°59'50.8"S 29°52'07.5"E
Construction of a lodge for 50 guest guest beds and 30 staff beds on a new concession of approximately 15 000 hectares south of the Letaba River on the western boundary of the Kruger National Park in Mpumalanga. Certain activities will be allowed on the concession area and could include equestrian activities.
Rehabilitation of Mabilisa, Magwaza and Mabuza Streets in Wesselton Ext 2, Ermelo, Mpumalanga. The GPS marker has been placed on Mabilisa street 26°31'00.9"S 29°58'17.3"E
Resurfacing of the R35 Section 2 from Bethal at km 0.00 to Middelburg at km 74.6 in the Steve Tshwete District Municipality, Mpumalanga Province. The GPS Marker has been placed at the start of the R35 in Bethal 26°27'37.6"S 29°28'11.7"E