Periodic maintenance of National Route 1 Section 10 from Kantfontein at km 19.55 to Waaikraal at km 34.70 in the District Municipality of Pixley Ka Seme and Local Municipality of Umsobomvu and Ubuntu, Northern Cape. CIDB 7CE. The exact GPS location is not known and the marker has been placed along the
Construction of the Engineering Operations Centre (EOC) for the South African Radio Astronomy Observatory (SARAO) at Klerefontein, Northern Cape. CIDB 8GB. Scope of works will include: SARAO will require the services of various specialists (Architectural including Structural) Engineers conduct the necessary
Upgrades, additions and Routine Road Maintenance of National Route 10 Sections 5 to 8 between Kopieskraal (km 31.322) and Omdraai Vlei (km 61.641) situated in the Pixley Ka Seme District Municipality, Northern Cape. The project value is R 107 661 724.40. The exact GPS location is not known and the marker
Periodic maintenance on National Route 10 Section 8 from Britstown at km 0.00 to Schilders Pan at km 61.64 in the Pixely ka Seme District Municipality, Northern Cape. The GPS marker has been placed along the proposed construction route 30°27'07.8"S 23°22'38.8"E.
The proposed Sishen Expansion Project at SIOM comprises of further pit expansions that include Far south pushback 21 and 19, Lylyveld pit expansion, C&G stockpile at Far south and Lylyveld pit, Moolmans workshop, access road and pollution control dam, proposed Far south Waste Rock Dump,heavy and light
Construction and operation of grid connection infrastructure consisting of a single circuit 132kV power line between the existing Emil Traction Substation and the authorised Olifantshoek Substation located near the town of Olifantshoek located within the Gamagara Local Municipality and the greater John
Lehating Mining proposes to establish a new manganese mining operation near Hotazel in the Northern Cape. The project will involve underground mining accessed via a decline shaft, crushing, screening and transport of manganese ore as well as associated infrastructure and services. The mining and related
Periodic maintenance of National Route 8 Section 6 from Volop at km 90.00 to Griekwastad at km 135.36, Siyancuma Local Municipality, Pixley ka Seme District Municipality, Northern Cape. The value of the project is R 81 846 694,05. The exact GPS location is not known and the marker has been placed at
Tshipi e Ntle Manganese Mining currently holds a prospecting right for manganese on portion 2 of the Farm Wessels 227 and the remaining extent and portions 3 and 4 of the Farm Dibaghomo 226, north of Black Rock in the Northern Cape Province. Tshipi is planning to apply to the DMR for a mining right over
The Wouterspan project is located opposite Rockswell's Saxendrift diamond mine, on the Orange river and is central to Rockwell's strategy to process 500 000 m³/m of high quality gravels from the middle Orange River region. The property has estimated inferred resources of 37.77 million cubic meters and