Refurbishment, upgrading and completion of existing H-Block, CSSD, kitchen, administration, medical blocks and construction of new mortuary at Boitumelo Hospital located approximately at Smaldeel Road, Kroonstad Rural, Kroonstad, 9500, Free State. Project value: R 131 676 119.13. Co-Ordinates: lat: -27.6460871;
Construction of the bulk water pipeline and a clear water intermediate pumping station from Koppies to Edenville, in the Free State. CIDB 7 CE/PE. The exact co-ordinates are currently not available however the approximate area of location is lat: -27.2290951; long: 27.58773699999999.
WRE and Harmony have annoucned the discovery of a major gold deposit, which would lead to one of the country's first new gold mines in 25 years. The resources contain 11.5 million ounces of gold at a grade of 8.89g/t of gold. A scoping study completed on the project has shown very impressive economic
Construction of water networks at Grassland 4 for 2 500 households located in the Free State. CIDB 8CE. The exact co-ordinates are currently not available however the approximate area of location is lat: -29.1656155; long: 26.304279.
Construction of the 240MW Reitgat photovotalic solar energy facility and associated infrastructure, including a 33kV or 132 kV transmission line, 132 kV substation, 33kV cabling, up to 400kV Eskom substation / switching station and four loop-in-loop-out overhead power lines up to 275kV each,on the Remaining
Taung Gold (Free State) Pty Ltd (Taung) is proposing to revive the historical Jeanette Gold Mine. The proposed project is located approximately 20km northwest of Welkom in the Free State Province, The majority of the target ore resource lies between the R30 provincial road in the north and the R34 provincial
Construction of a new carriageway including new bridges and rehabilitation of the existing carriageway between the Wilge Toll Plaza and the Vaal River of the N3 Toll Road: N3-9 km 74,5 to km 77,2 and N3 - 10 km 0,0 to km 1,0 Highway Section 8B within the Free State and Mpumalanga Provinces. The majority
The project involves the optimal extraction of the orebody within the lower mine area of the Moab Khotsong, beneath the farm Zaaiplaats in the Free State. The project will extend the mine's life to 2035 and entails the deepening of the mine from 101 level to 105 level. The most important of these blocks
Construction of the Vrede 100MW solar photovoltaic facility, including battery energy storage systems and associated infrastructure located 6km from Kroonstad in the Moqhaka Local Municipality in the Free State. Co-ordinates: 27°44'2.28"S; 27° 7'55.90"E
Construction of infrastructure and services for 5 390 erven in Maokeng, Kroonstad, Free State. Works consist of water, sanitation, roads and stormwater and high mast lighting. CIDB Grading of 9CE / 8CE PE or higher. The exact co-ordinates are currently not available however the approximate area of location