Construction of the 300MW Miombo Hewani Wind Farm and Transmission Line, located 10km's north of Makambako, southern central Tanzania. The wind farm will be built in phases; the first phase of the project will be around 100MW and include up to 34 wind turbines as well as electric infrastructure connecting
The expansion of electricity services in Zanzibar, Tanzania. The Tanzanian government has launched the Zanzibar Energy Sector Transformation Project to create an enabling environment for private sector participation in the Zanzibar electricity sector. The exact co-ordinates are currently not available
Construction of the Zanzibar Domino mixed-use tower, 15km from Stone Town, on the west coast of Zanzibar, Tanzania. The entire project will be developed on an artificial island that will be linked to the main island by a high and low bridge structure. The tower itself will be a 70 floor commercial tower
Naujombo and Kishugu are located 35km from one another, within the same structural corridor and both anomalies exhibit very similar multi-element signatures (arsenic, bismuth and silver), the Naujombo deposit is located in south-east Tanzania. Previous drilling undertaken during the 2016 field season
The Kahama Project, located within the renown Lake Victoria Gold Fields in Western Tanzania is targeting shear zone hosted gold mineralisation and the property of a similar style to that occurring at Uyowa. The Tanzanian Projects include two approved prospecting licences (PLs) and 7 primary mining licences
Construction of the Msalato International Airport in Dodoma-Arusha, Tanzania. The land designated for the airport is approximately 45km². The project will entail the construction of the runway, main passenger aircraft parking apron, aircraft control tower, passengers terminal and office buildings, car
Naujombo and Kishugu are located 35km from one another, within the same structural corridor and both anomalies exhibit very similar multi-element signatures (arsenic, bismuth and silver). Previous drilling undertaken during the 2016 field season identified significant zones of gold anomaly with confirmed
The Minjingu uranium phosphate project covers a total of 296.9km² and is located in northern Tanzania, 106km south-west of Arusha and 520km north-west of Dar es salaam. The exact co-ordinates are currently not available however the approximate area of location is lat: -4.645505564562907, long: 36.327397443591664
The Wigu Hill rare earth element project in Tanzania is a light rare earth element deposit and a large carbonite complex with bastnaesite mineralization. The licence area covers 142km². The exact co-ordinates are currently not available however the approximate area of location is lat: -7.399999999999998;
The Lupa Goldfield is the second largest goldfield in Tanzania outside of the Lake Victoria Goldfield. From 1935 to 1959 an estimated 650,000 ounces of gold were extracted from the area. The Lupa Goldfields, located with the Ubendian model belt, is a triangular shaped block of approximately 2 600km²